Installation is the reverse of removal.
Route the lead correctly (see Cable, Wire, and Hose Routing section in the Appendix chapter).
Tie-Rod and Rocker Arm Bearing Installation
Replace the needle bearings [A] and oil seals with new
ones.
Apply plenty of grease to the lips of the oil seals.
Install the needle bearings and oil seals position as shown
in the figure.
Screw the needle bearing driver into the driver holder.
Insert the needle bearing driver into th ...
Rear Shock Absorber Installation
Replace the rear shock absorber nuts and tie-rod nuts
with new ones.
Tighten:
Torque - Rear Shock Absorber Nuts: 34 N·m (3.5 kgf·m, 25
ft·lb)
Tie-Rod Nuts: 34 N·m (3.5 kgf·m, 25 ft·lb)
When installing the rear shock absorber bracket [A], install
it so that the recess side [B] ...
Exploded View
11. ZX1000JD/KD
AD: Apply adhesive.
AL: Tighten the two clamp bolts alternately two times to ensure even tightening
torque.
G: Apply grease.
L: Apply a non-permanent locking agent.
Specifications
...