Kawasaki Ninja Service Manual: Throttle Body Assy Assembly

Kawasaki Ninja Service Manual / Fuel System (DFI) / Throttle Body Assy / Throttle Body Assy Assembly

Throttle Body Assy Assembly


Insert the joint pipe so that the short side [D] faces right side.

Left and right delivery pipes are identical.

Throttle Body Assy Assembly


Throttle Body Assy Assembly


Throttle Body Assy Disassembly
1. Throttle Body Assy 2. Subthrottle Valve Actuator 3. Idle Speed Control Valve Actuator 4. Main Throttle Sensor 5. Subthrottle Sensor 6. Primary Fuel Injectors 7. Delivery Pipe Assy NOTICE ...

Nozzle Assy
...

Other materials:

Water Temperature Sensor Removal/Installation
NOTICE Never drop the water temperature sensor especially on a hard surface. Such a shock to the sensor can damage it. Remove the throttle body assy (see Throttle Body Assy Removal in the Fuel System (DFI) chapter). Drain the coolant (see Coolant Change in the Periodic Maintenance c ...

Oil Cooler Installation
Replace the O-ring [A] with a new one. Apply grease to the new O-ring. Install the water hoses and hose clamps [A] as shown in the figure. Water Hose (About 300 mm, 11.8 in.) [B] Water Hose (About 130 mm, 5.1 in.) [C] Yellow Paint [D] Tighten: Torque - Water Hose Clamp S ...

Air Intake Duct Removal
Remove: Upper Fairing Assembly (see Upper Fairing Assembly Removal in the Frame chapter) Meter Bracket (see Meter Unit Removal/Installation in the Electrical System chapter) Immobilizer Amplifier [A] (Equipped Models) (see Immobilizer System Parts Replacement in the Electrical System ...