DFI Power Source
ECU Fuse Removal
Refer to the 30 A Main/15 A ECU Fuse Removal in the
Electrical System chapter.
ECU Fuse Installation
If a fuse fails during operation, inspect the DFI system to
determine the cause, and then replace it with a new fuse
of proper amperage.
Refer to the Fuse Installation in ...
Connecting Rod Twist Inspection
With the big-end arbor [A] still on V block [C], hold the
connecting rod horizontally and measure the amount that
the arbor [B] varies from being paralleled with the surface
plate over a 100 mm (3.94 in.) length of the arbor to determine
the amount of connecting rod twist.
If the conne ...
Relay Circuit Inspection
Remove the relay box (see Relay Box Removal).
Check conductivity of the following numbered terminals
by connecting the hand tester and one 12 V battery to the
relay box as shown in the figure (see Relay Box Internal
Circuit in this section).
If the tester does not read as specified, re ...