Kawasaki Ninja Service Manual: Engine Oil Change

Kawasaki Ninja Service Manual / Periodic Maintenance / Periodic Maintenance Procedures / Replacement Parts / Engine Oil Change

The oil in the oil filter can be drained by removing the filter (see Oil Filter Replacement).

Torque - Engine Oil Drain Bolt: 29 N·m (3.0 kgf·m, 21 ft·lb)

Engine Oil Change


Engine Oil Change


Recommended Engine Oil

Type: API SG, SH, SJ, SL or SM with JASO MA, MA1 or MA2

Viscosity: SAE 10W-40

Capacity: 2.9 L (3.1 US qt) (when filter is not removed) 3.3 L (3.5 US qt) (when filter is removed) 3.7 L (3.9 US qt) (when engine is completely dry)


NOTE

Replace the O-ring of the oil filler plug with a new one.

Apply engine oil to the new O-ring.

Install the oil filler plug.

Torque - Oil Filler Plug: Hand-tighten

Radiator Hose and O-ring Replacement
Drain the coolant (see Coolant Change). Remove: Upper Fairing Assembly (see Upper Fairing Assembly Removal in the Frame chapter) Thermostat Housing [A] (see Thermostat Removal in the Cool ...

Oil Filter Replacement
Drain the engine oil (see Engine Oil Change). Remove the left lower fairing (see Lower Fairing Removal in the Frame chapter). Remove the oil filter [A] with the oil filter wrench [B]. Spec ...

Other materials:

Rear Shock Absorber Removal
Remove: Lower Fairings (see Lower Fairing Removal in the Frame chapter) Fuel Tank (see Fuel Tank Removal in the Fuel System chapter) Bolts [A] (Both Sides) Foot Guard [B] (Both Sides) Squeeze the brake lever slowly and hold it with a band [A]. WARNINGBe sure to h ...

Gear Position Switch Output Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Remove the fuel tank (see Fuel Tank Removal in the Fuel System (DFI) chapter). Disconnect the sidestand switch/gear position switch lead connector [A]. Connect the measuring adapter [A] between the ...

ZX1000JB/KB Models
1. Run the fuse box 2 lead in front of the rib for the fuse box 2. 2. Seat Lock Cable 3. Hook the licence plate light lead and the left turn signal light lead on the projection of the tool kit case. 4. Rib for Fuse Box 2 5. Run the starter relay lead in back of the rib for the fuse box 2 ...