Kawasaki Ninja Service Manual: Nozzle Assy Installation

Kawasaki Ninja Service Manual / Fuel System (DFI) / Nozzle Assy / Nozzle Assy Installation

Push the four mounting positions of the injectors.

Set the joint pipe parallel to the air cleaner housing [B].

NOTICE

When installing the nozzle assy, apply force equally to the delivery pipe assy.

Pushing the fuel pipe strongly could damage it as it is made from resin.

Nozzle Assy Installation


Torque - Nozzle Assy Mounting Bolts: 4.9 N·m (0.50 kgf·m, 43 in·lb)

Nozzle Assy Installation


Nozzle Assy Removal
Remove the fuel tank (see Fuel Tank Removal). Disconnect the secondary fuel hose [A] from the delivery pipe assy of the nozzle assy [B] (see Fuel Hose Replacement in the Periodic Maintenance ...

Nozzle Assy Disassembly
Remove the nozzle assy (see Nozzle Assy Removal). Pull out the secondary fuel injectors [A] from the delivery pipe assy [B]. NOTE Do not damage the insertion portions of the injectors when ...

Other materials:

What Are The Dealership’s Responsibilities?
Your Kawasaki dealer offers a wide range of services, parts, accessories, and information on your product and on Kawasaki. Each dealer is independently owned and operated and is responsible for the dealership’s operations, its repair, warranty, and service work, and its personnel. Your dea ...

Upper Crankcase Assembly
When installing the breather plate, replace the gasket [A] with a new one. Apply a non-permanent locking agent to the threads of the bolts [A] and tighten them. Torque - Breather Plate Bolts: 9.8 N·m (1.0 kgf·m, 87 in·lb) Install the fitting [A] until it is bottomed ...

Premuffler Chamber Installation
Replace the premuffler chamber gasket [A] with a new one. Install the premuffler chamber gasket to the premuffler chamber [B] until it is bottomed so that the chamfer side faces exhaust pipe [C]. Install the exhaust pipe clamp [D] as shown in the figure. Insert the projection [E] into ...