Kawasaki Ninja Service Manual: Timing Rotor Installation

Kawasaki Ninja Service Manual / Electrical System / Ignition System / Timing Rotor Installation

Torque - Timing Rotor Bolt: 39 N·m (4.0 kgf·m, 29 ft·lb) Special Tool - Flywheel & Pulley Holder: 57001-1605

Timing Rotor Installation


Timing Rotor Removal
Remove the crankshaft sensor cover (see Crankshaft Sensor Removal). Remove the timing rotor [A]. Holding the timing rotor with the flywheel & pulley holder [B] and unscrew the bolt [C]. ...

Stick Coil Removal
Remove the air cleaner housing (see Air Cleaner Housing Removal in the Fuel System (DFI) chapter). Disconnect the stick coil connectors [A]. Pull out the stick coils [B] upward. First, tur ...

Other materials:

Cooling System Flushing
Over a period of time, the cooling system accumulates rust, scale, and lime in the water jacket and radiator. When this accumulation is suspected or observed, flush the cooling system. If this accumulation is not removed, it will clog up the water passage and considerable reduce the efficiency ...

Operating Procedures
Clean the seat area carefully. Coat the seat with machinist’s dye. Fit a 45° cutter into the holder and slide it into the valve guide. Press down lightly on the handle and turn it right or left. Grind the seating surface only until it is smooth. NOTICE Do not grind the seat too ...

Radiator and Radiator Fan Installation
If the radiator bracket [A] was removed, install it. Install the radiator fan to the radiator Tighten the radiator fan mounting bolts. When installing the pad [B], install it so that the upper end of the pad aligns with the corner top [C]. When install the pad [D], install it so that the ...