Turn Signal Switch
Engine Stop SwitchConnecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
Balance Weight Installation
Check if the weight portion has any play on the blade [A]
and clip [B].
If it does, discard it.
WARNINGUnbalanced wheels can create an unsafe
riding
condition. If the balance weight has any play on
the rib of the rim, the blade and/or clip have been
stretched. Replace th ...
Refreshing Charge
Remove the battery (see Battery Removal).
Do refresh charge by following method according to the
battery terminal voltage.
WARNINGThis battery is sealed type. Charge with
current and
time as stated below.
Terminal Voltage: 12.0 12.7
V
Standard Charge (see following ...