Turn Signal Switch
Engine Stop SwitchConnecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
External Shift Mechanism Installation
Install the gear positioning lever [A] as shown in the figure.
Install:
Spring [B]
Washer [C]
Tighten:
Torque - Gear Positioning Lever Bolt [D]: 12 N·m (1.2 kgf·m,
106 in·lb)
Assemble:
Ratchet [A]
Pawls [B]
Pins [C]
Springs [D]
Install the shift ratchet ...
ZX1000JC /KC
Models
1. Run the fuse box 2 lead in front of the rib for the fuse box 2.
2. Seat Lock Cable
3. Hook the licence plate light lead and the left turn signal light lead on
the projection of the tool
kit case.
4. Rib for Fuse Box 2
5. Run the starter relay lead in back of the rib for the fuse box 2 ...