Kawasaki Ninja Owners Manual: Battery Installation

Kawasaki Ninja Owners Manual / Maintenance and adjustment / Battery / Battery Installation

NOTICE

Installing the (–) cable to the (+) terminal of the battery or the (+) cable to the (–) terminal of the battery can seriously damaged the electrical system.

Battery Removal
Remove the rider’s seat (see Seats section in the GENERAL INFORMATION chapter). Turn the ignition switch to “OFF” and disconnect the (–) cable from the battery. Remove the red cap ...

Headlight Beam
NOTE Do not turn the bolts because the reflector in the headlight comes off. A. Bolts The left and right adjusters on the headlight can move the direction of the headlight beam to up, d ...

Other materials:

Braking
Close the throttle completely, leaving the clutch engaged (except when shifting gears) so that the engine will help slow down the motorcycle. Shift down one gear at a time so that you are in 1st gear when you come to a complete stop. When stopping, always apply both brakes at the ...

Handlebar Installation
Apply a non-permanent locking agent to the threads of the handlebar positioning bolts and tighten them. Torque - Handlebar Positioning Bolts: 9.8 N·m (1.0 kgf·m, 87 in·lb) Install the steering stem head with handlebars. Install the washer [A] and steering stem head nut [B]. Tighten: ...

Coolant Filling
Remove the bolts and quick rivets. Detach the tabs and remove the right fairing and cover. A. Bolts B. Quick Rivet C. Large Quick Rivet D. Tabs E. Right Fairing and Cover NOTE The right fairing and cover uses the quick rivets and large quick rivet. The large quick rivet ca ...