Kawasaki Ninja Owners Manual: Battery Installation

Kawasaki Ninja Owners Manual / Maintenance and adjustment / Battery / Battery Installation

NOTICE

Installing the (–) cable to the (+) terminal of the battery or the (+) cable to the (–) terminal of the battery can seriously damaged the electrical system.

Battery Removal
Remove the rider’s seat (see Seats section in the GENERAL INFORMATION chapter). Turn the ignition switch to “OFF” and disconnect the (–) cable from the battery. Remove the red cap ...

Headlight Beam
NOTE Do not turn the bolts because the reflector in the headlight comes off. A. Bolts The left and right adjusters on the headlight can move the direction of the headlight beam to up, d ...

Other materials:

Nozzle Assy Disassembly
Remove the nozzle assy (see Nozzle Assy Removal). Pull out the secondary fuel injectors [A] from the delivery pipe assy [B]. NOTE Do not damage the insertion portions of the injectors when they are pulled out from the delivery pipe assy. NOTICE Never drop the secondary fuel injecto ...

Idle Speed Control Valve Actuator Input Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Disconnect the idle speed control valve actuator connector and connect a suitable measuring leads [A] between these connectors as shown in the figure. Main Harness [B] Idle Speed Control Valve Actua ...

Evaporative Emission Control System (California model only)
This system routes fuel vapors from the fuel system into the running engine or stores the vapors in a canister when the engine is stopped. Although no adjustments are required, a thorough visual inspection must be made at the intervals specified by the Periodic Maintenance Chart. Inspection ...