Light (LED) Inspection

Refer to the Meter Unit Inspection in the Electrical System chapter.
DFI System Troubleshooting Guide
ECUClutch Cover Assembly
Replace the needle bearings and oil seal with new ones.
NOTE
Install the needle bearings so that the manufacture’s
mark face out.
Install the needle bearings [A] and oil seal [B] position as
shown in the figure.
Press the upper and lower bearings so that the bearing
surface [ ...
Connecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
Lower Fairing Installation
Installation is the reverse of removal. Note the following.
When installing the pad [A], align the edge of the pad and
the marking of the fairing [B].
When installing the pad [C], align the edge of the pad and
the fairing [D], and fit the edge of the pad to the boss [E].
Insert the hoo ...