Light (LED) Inspection

Refer to the Meter Unit Inspection in the Electrical System chapter.
DFI System Troubleshooting Guide
ECUBalancer Installation
Position the crankshaft at #2, 3 positions TDC or at #1, 4
positions TDC.
Install the balancer assembly as follows.
Align the punch mark [A] on the weight and the projection
[B] on the crankcase.
Engage the balancer gear and the crankshaft gear.
Insert the balancer shaft until it is bot ...
Rear Shock Absorber Scrapping
WARNINGPressurized nitrogen may explode when
heated.
The rear shock contains nitrogen gas. To avoid
an explosion, do not incinerate the shock body
without first releasing the nitrogen and removing
the shraeder valve.
Remove the rear shock absorber (see Rear Shock Ab ...
ZX1000JB/KB Models
1. Run the fuse box 2 lead in front of the rib for the fuse box 2.
2. Seat Lock Cable
3. Hook the licence plate light lead and the left turn signal light lead on
the projection of the tool
kit case.
4. Rib for Fuse Box 2
5. Run the starter relay lead in back of the rib for the fuse box 2 ...