Light (LED) Inspection

Refer to the Meter Unit Inspection in the Electrical System chapter.
DFI System Troubleshooting Guide
ECUESD Actuator Input Voltage Inspection
NOTE
Be sure the battery is fully charged.
Turn the ignition switch to OFF.
Disconnect the ESD actuator connector and connect a
suitable measuring leads [A] between these connectors
as shown.
Main Harness [B]
ESD Actuator [C]
Connect the peak voltage adapter [D] and a digital ...
Coolant Level Inspection
Situate the motorcycle so that it is
perpendicular to the ground.
Check the coolant level through the
coolant level gauge on the reserve
tank located to the left of the engine.
The coolant level should be between
the “F” (Full) and “L” (Low) level lines.
A. Reserve Ta ...
Swingarm Bearing Installation
Replace the needle bearings, ball bearing, grease seals
and circlip with new ones.
Install the needle bearings, ball bearing, grease seals and
circlip as shown in the figure.
Insert the needle bearing driver [A] into the needle bearing
[B] and press the needle bearing into the housing u ...