Kawasaki Ninja Service Manual: Fuse

Kawasaki Ninja Service Manual / Electrical System / Fuse

Diode Circuit Inspection
Remove the relay box (see Relay Box Removal). Check conductivity of the following pairs of terminals (see Relay Box Internal Circuit in this section). Diode Circuit Inspection The resistan ...

30 A Main/15 A ECU Fuse Removal
Take the starter relay off the rear fender (see Starter Relay Inspection). Remove the starter relay cover Take the fuses [A] off the starter relay with needle nose pliers. ...

Other materials:

Gear Position Switch Installation
Securely place the springs [A] and pins [B] into the holes [C] of the shift drum. Apply grease to the new O-ring [D]. Install the gear position switch [E]. Apply a non-permanent locking agent to the threads of the gear position switch screws [F]. Tighten: Torque - Gear Position Swit ...

Flap and Rear Fender Rear Installation
Installation is the reverse of removal. Note the following. Fit the tab [A] to the slot [B]. Run the seat lock cable [C] between the tool kit case and the turn signal light as shown in the figure. When installing the dampers [A] on the lower pipe [B], install it as shown in the figure. ...

Idle Speed
The idle speed inspection should be performed in accordance with the Periodic Maintenance Chart. This motorcycle is equipped with the Idle Speed Control valve. If the idle speed is disturbed, inspection of the idle speed control should be done by an authorized Kawasaki dealer. NOTE While ...