п»ї
Exploded View
AL: Tighten the two clamp bolts alternately two times to ensure even
tightening torque.
G: Apply grease.
R: Replacement Parts
G: Apply grease.
L: Apply a non-permanent locking agent.
R: Replacement Parts
Specifications
...
Engine Vacuum Synchronization Inspection
NOTE
These procedures are explained on the assumption that
the intake and exhaust systems of the engine are in
good condition.
Situate the motorcycle so that it is vertical.
Remove:
Fuel Tank (see Fuel Tank Removal in the Fuel System
(DFI) chapter)
Air Cleaner Housing (see Air Cleaner ...
Stick Coil Primary Peak Voltage Inspection
NOTE
Be sure the battery is fully charged.
Remove the stick coils (see Stick Coil Removal).
Do not remove the spark plugs.
Connect the ECU to the harness.
Measure the primary peak voltage as follows.
Install the new spark plug [A] into each stick coil [B], and
ground them onto ...