Kawasaki Ninja Service Manual: Upper Inner Fairing Removal

Kawasaki Ninja Service Manual / Frame / Fairings / Upper Inner Fairing Removal

Upper Inner Fairing Removal


Upper Fairing Assembly Disassembly
Remove: Upper Fairing Assembly (see Upper Fairing Assembly Removal) Headlight (see Headlight Removal/Installation in the Electrical System chapter) City Light (LED) (see City Light (LED) ...

Upper Inner Fairing Installation
Installation is the reverse of removal. Note the following. Place the tab [A] under the cover as shown in the figure. Insert the projection [B] into the grommet [C]. ...

Other materials:

Piston Ring Thickness Inspection
Measure the piston ring thickness. Use the micrometer to measure at several points around the ring. Piston Ring Thickness Standard: Top [A] 0.77 0.79 mm (0.0303 0.0311 in.) Second [B] 0.78 0.79 mm (0.0307 0.0311 in.) Service Limit: Top 0.70 mm (0.0276 in.) Second 0.71 mm (0.0280 ...

Cylinder Head Cover Removal
Remove: Air Suction Valves (see Air Suction Valve Removal) Throttle Body Assy (see Throttle Body Assy Removal in the Fuel System (DFI) chapter) Stick Coils (see Stick Coil Removal in the Electrical System chapter) Remove the clamps [A]. Turn up the front side of the heat insulation ...

Rear Fender Front Installation
Installation is the reverse of removal. Note the following. Run the harness, cables and leads correctly (see Cable, Wire, and Hose Routing section in the Appendix chapter). When installing the clamp [A] on the rear fender front [B], install it so that the clamp positions at near the ...