Kawasaki Ninja Service Manual: Frame

Kawasaki Ninja Service Manual / Frame

Handlebar Installation
Apply a non-permanent locking agent to the threads of the handlebar positioning bolts and tighten them. Torque - Handlebar Positioning Bolts: 9.8 N·m (1.0 kgf·m, 87 in·lb) Install the steeri ...

Exploded View
10. US, CA, CAL and AU Models 11. ZX1000JD/KD G: Apply grease. L: Apply a non-permanent locking agent. R: Replacement Parts S: Follow the specified tightening sequence. 1. US, CA ...

Other materials:

ECU Power Supply Inspection
Remove the upper air cleaner housing (see Air Cleaner Element Replacement in the Periodic Maintenance chapter). Visually inspect the ECU connectors. If the connector is clogged with mud or dust, blow it off with compressed air. Remove the ECU (see ECU Removal). Visually inspect the ...

Premuffler Chamber Installation
Replace the premuffler chamber gasket [A] with a new one. Install the premuffler chamber gasket to the premuffler chamber [B] until it is bottomed so that the chamfer side faces exhaust pipe [C]. Install the exhaust pipe clamp [D] as shown in the figure. Insert the projection [E] into ...

Rear Sprocket Removal
Remove the rear wheel (see Rear Wheel Removal in the Wheels/Tires chapter). NOTICE Do not lay the wheel on the ground with the disc facing down. This can damage or warp the disc. Place blocks under the wheel so that the disc does not touch the ground. Remove: Rear Sprocket Nu ...