Kawasaki Ninja Service Manual: Frame

Kawasaki Ninja Service Manual / Frame

Handlebar Installation
Apply a non-permanent locking agent to the threads of the handlebar positioning bolts and tighten them. Torque - Handlebar Positioning Bolts: 9.8 N·m (1.0 kgf·m, 87 in·lb) Install the steeri ...

Exploded View
10. US, CA, CAL and AU Models 11. ZX1000JD/KD G: Apply grease. L: Apply a non-permanent locking agent. R: Replacement Parts S: Follow the specified tightening sequence. 1. US, CA ...

Other materials:

Nozzle Assy Installation
Replace the dust seals [A] with new ones. Apply engine oil to the new dust seals, and install them. Install the nozzle assy securely. Push the four mounting positions of the injectors. Set the joint pipe parallel to the air cleaner housing [B]. NOTICE When installing the nozzle assy, ap ...

Rocker Arm Installation
Install the both rocker arms [A] so that their marks [B] face left side. Replace the tie-rod nut, rear shock absorber nut and rocker arm nut with new ones. Apply grease to the inside of the oil seals. Tighten: Torque - Rocker Arm Nut: 34 N·m (3.5 kgf·m, 25 ft·lb) Tie-Rod ...

KIBS Warning Indicator Light (For models equipped with KIBS)
The yellow warning indicator light in the meter unit functions as the KIBS warning indicator light. The yellow warning indicator light and warning symbol “KIBS” go on if there is a malfunction in the KIBS system. When the warning light is on, the KIBS system stops functioning. However, th ...