Kawasaki Ninja Service Manual: Frame

Kawasaki Ninja Service Manual / Frame

Handlebar Installation
Apply a non-permanent locking agent to the threads of the handlebar positioning bolts and tighten them. Torque - Handlebar Positioning Bolts: 9.8 N·m (1.0 kgf·m, 87 in·lb) Install the steeri ...

Exploded View
10. US, CA, CAL and AU Models 11. ZX1000JD/KD G: Apply grease. L: Apply a non-permanent locking agent. R: Replacement Parts S: Follow the specified tightening sequence. 1. US, CA ...

Other materials:

Clutch Lever Installation
Install the clutch lever so that the mating surface [A] of the clutch lever clamp is aligned with the punch mark [B] of the handlebar. Tighten the upper clamp bolt first, and then the lower clamp bolt. Torque - Clutch Lever Clamp Bolts: 7.8 N·m (0.80 kgf·m, 69 in·lb) There will be ...

Upper Crankcase Assembly
When installing the breather plate, replace the gasket [A] with a new one. Apply a non-permanent locking agent to the threads of the bolts [A] and tighten them. Torque - Breather Plate Bolts: 9.8 N·m (1.0 kgf·m, 87 in·lb) Install the fitting [A] until it is bottomed ...

Oil Cooler Installation
Replace the O-ring [A] with a new one. Apply grease to the new O-ring. Install the water hoses and hose clamps [A] as shown in the figure. Water Hose (About 300 mm, 11.8 in.) [B] Water Hose (About 130 mm, 5.1 in.) [C] Yellow Paint [D] Tighten: Torque - Water Hose Clamp S ...