Light (LED) Inspection

Refer to the Meter Unit Inspection in the Electrical System chapter.
DFI System Troubleshooting Guide
ECUExploded View
11. ZX1000JD/KD
AD: Apply adhesive.
AL: Tighten the two clamp bolts alternately two times to ensure even tightening
torque.
G: Apply grease.
L: Apply a non-permanent locking agent.
Specifications
...
Mud Guard Installation
Installation is the reverse of removal. Note the following.
Run the hose and lead correctly (see Cable, Wire, and
Hose Routing section in the Appendix chapter).
Check the brake line.
Apply a non-permanent locking agent to the threads of
the mud guard mounting bolts [A, B], and tighten them ...
Spring Preload Adjustment
Remove the rear shock absorber from the frame (see
Rear Shock Absorber Removal).
Loosen the locknut and turn out the adjusting nut to free
the spring.
Special Tools - Hook Wrench T=3.2 R37: 57001-1539
Hook Wrench R=35: 57001-1580
To adjust the spring preload, turn in the adjusting n ...