Spark Plug Replacement
Exploded ViewConnecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
Lower Crankcase Assembly
Install the ball bearing [A] and the oil level inspection window
[B] until they are bottomed
Apply soap and water solution to the oil level inspection
window before installation.
Install the new circlip [C].
Apply a non-permanent locking agent to the oil passage
plug [D].
Tighten: ...
CAN Communication Line
CAN Communication Line
Resistance Inspection
In this model, resistors for CAN communication line are
built in the ECU [A] and meter unit.
Refer to the Meter Unit Inspection in the Electrical System
chapter for the resistor in the meter unit.
Turn the ignition switch to OFF.
Remove:
EC ...