Kawasaki Ninja Service Manual: Air Intake Solenoid Valve

Kawasaki Ninja Service Manual / Electrical System / Air Intake Solenoid Valve

Air Switching Valve
Air Switching Valve Operation Test Refer to the Air Suction System Damage Inspection in the Periodic Maintenance chapter. Air Switching Valve Unit Test Remove the air switching valve (see Air ...

Air Intake Solenoid Valve Operation Test
Start the engine and run it at idle speed. Check the air intake valve [A] as follows. When the engine is running, the air intake valve is lifting up. If the valve does not operate properly, ...

Other materials:

Piston Removal
Remove: Crankshaft (see Crankshaft Removal) Remove the piston together with the connecting rod to the cylinder head side. NOTICE Discard the connecting rod bolts and nuts. To prevent damage to the crankpin surfaces, do not allow the connecting rod bolts to bump against the crankpins. ...

Upper Fairing Assembly Disassembly
Remove: Upper Fairing Assembly (see Upper Fairing Assembly Removal) Headlight (see Headlight Removal/Installation in the Electrical System chapter) City Light (LED) (see City Light (LED) Removal/Installation in the Electrical System chapter) Remove the screws [A], and separate each ...

Fuel Pump Installation
Remove dirt or dust from the fuel pump [A] by lightly applying compressed air. Replace the fuel pump gasket with a new one. Check that the fuel pump terminal [A] and band [B] are in place. Apply a non-permanent locking agent to the threads of the fuel pump bolts. Tighten the ...