Kawasaki Ninja Service Manual: Steering Stem

Kawasaki Ninja Service Manual / Steering / Steering Stem

ESD (Electronic Steering Damper) ECU Installation (ZX1000JD/KD)
Install the ESD ECU [A] in the rubber protector [B]. Connect the ESD ECU connector. Install the ESD ECU on the air cleaner housing. Install the removed parts (see appropriate chapters). ...

Stem, Stem Bearing Removal
Remove: Upper Fairing Assembly (see Upper Fairing Assembly Removal in the Frame chapter) Front Fender (see Front Fender Removal in the Frame chapter) Front Wheel (see Front Wheel Removal ...

Other materials:

Water Pump Impeller Disassembly/Assembly
Remove the water pump impeller (see Oil Pump Removal in the Engine Lubrication System chapter). The sealing seat and rubber seal may be removed easily by hand. Apply coolant around the surfaces of the rubber seal and sealing seat. Install the rubber seal [A] and sealing seat [B] into ...

Switch Inspection
Using a hand tester, check to see that only the connections shown in the table have continuity. Special Tool - Hand Tester: 57001-1394 For the switch housings and the ignition switch, refer to the tables in the Wiring Diagram. If the switch has an open or short, repair it or replace it w ...

Oil Seal, Grease Seal
Do not remove pressed oil or grease seals unless removal is necessary. Replace with new ones whenever removed. Press new oil seals with manufacture and size marks facing out. Make sure the seal is aligned properly when installing. Apply specified grease to the lip of seal before installing ...