ESD (Electronic Steering Damper) ECU Installation (ZX1000JD/KD)
Stem, Stem Bearing RemovalFuel Injector Audible Inspection
NOTE
Be sure the battery is fully charged.
The secondary fuel injectors are operating with following
conditions.
1. The engine speed is more than 6 000 r/min (rpm).
2. The throttle opening is more than 12В°.
Remove:
Fuel Tank (see Fuel Tank Removal)
Primary Fuel Hose (see Fuel ...
Air Switching Valve
Air Switching Valve Operation Test
Refer to the Air Suction System Damage Inspection in the
Periodic Maintenance chapter.
Air Switching Valve Unit Test
Remove the air switching valve (see Air Switching Valve
Removal in the Engine Top End chapter).
Set the hand tester [A] to the × 1 ...
Radiator Cap Inspection
Remove:
Radiator Cap (see Coolant Change in the Periodic Maintenance
chapter)
Check the condition of the bottom [A] and top [B] valve
seals and valve spring [C].
If any one of them shows visible damage, replace the cap
with a new one.
Install the cap [A] on a cooling system pr ...