Kawasaki Ninja Service Manual: Steering Stem

Kawasaki Ninja Service Manual / Steering / Steering Stem

ESD (Electronic Steering Damper) ECU Installation (ZX1000JD/KD)
Install the ESD ECU [A] in the rubber protector [B]. Connect the ESD ECU connector. Install the ESD ECU on the air cleaner housing. Install the removed parts (see appropriate chapters). ...

Stem, Stem Bearing Removal
Remove: Upper Fairing Assembly (see Upper Fairing Assembly Removal in the Frame chapter) Front Fender (see Front Fender Removal in the Frame chapter) Front Wheel (see Front Wheel Removal ...

Other materials:

Cylinder Head Installation
NOTE The camshaft cap is machined with the cylinder head, so if a new cylinder head is installed, use the cap that is supplied with the new head. Install the dowel pins. Replace the cylinder head gasket with a new one. Replace the cylinder head bolt washers with new ones. Apply molybden ...

Armature Inspection
Using the × 1 Ω hand tester range, measure the resistance between any two commutator segments [A]. Special Tool - Hand Tester: 57001-1394 If there is a high resistance or no reading (∞) between any two segments, a winding is open and the starter motor must be replaced. ...

Coolant Filling
Remove the bolts and quick rivets. Detach the tabs and remove the right fairing and cover. A. Bolts B. Quick Rivet C. Large Quick Rivet D. Tabs E. Right Fairing and Cover NOTE The right fairing and cover uses the quick rivets and large quick rivet. The large quick rivet ca ...