Kawasaki Ninja Service Manual: Oil Pressure Relief Valve Installation

Kawasaki Ninja Service Manual / Engine Lubrication System / Oil Pressure Relief Valve / Oil Pressure Relief Valve Installation

NOTICE

Do not apply too much non-permanent locking agent to the threads. This may block the oil passage.

Torque - Oil Pressure Relief Valve: 15 N·m (1.5 kgf·m, 11 ft·lb)

Oil Pressure Relief Valve Removal
Remove: Oil Pan (see Oil Pan Removal) Oil Pressure Relief Valve [A] ...

Oil Pressure Relief Valve Inspection
Remove the oil pressure relief valve (see Oil Pressure Relief Valve Removal). Check to see if the valve [A] slides smoothly when pushing it in with a wooden or other soft rod, and see if it c ...

Other materials:

ESD Actuator Input Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Disconnect the ESD actuator connector and connect a suitable measuring leads [A] between these connectors as shown. Main Harness [B] ESD Actuator [C] Connect the peak voltage adapter [D] and a digital ...

CAN Communication Line
CAN Communication Line Resistance Inspection In this model, resistors for CAN communication line are built in the ECU [A] and meter unit. Refer to the Meter Unit Inspection in the Electrical System chapter for the resistor in the meter unit. Turn the ignition switch to OFF. Remove: EC ...

Wiring Diagram (Other than US, CA and CAL with KIBS Models)
ZX1000KC ZX1000KD ...