

Special Tools - Jack: 57001-1238 Jack Attachment: 57001-1608

Tie-Rod Installation
Rocker Arm RemovalWiring Diagram (Other than US, CA and CAL with KIBS Models)
ZX1000KC
ZX1000KD
...
Throttle Body Assy Holder Installation
Be sure to install the new O-rings [A].
Using a high flash-point solvent, clean off any oil or dirt
that may be on the silicone sealant coating area. Dry
them with a clean cloth.
Apply silicone sealant to any two positions of the new O
-ring.
Sealant - Liquid Gasket, TB1211F: 92104-0 ...
Wheel/Tire Damage Inspection
Remove any imbedded stones [A] or other foreign particles
[B] from tread.
Visually inspect the tire for cracks and cuts, and replace
the tire if necessary. Swelling or high spots indicate internal
damage, requiring tire replacement.
Visually inspect the wheel for cracks, cuts and dents ...