Kawasaki Ninja Service Manual: Tie-Rod Removal

Kawasaki Ninja Service Manual / Suspension / Tie-Rod, Rocker Arm / Tie-Rod Removal

Tie-Rod Removal


Tie-Rod Removal


Tie-Rod Removal


Tie-Rod Installation

Tie-Rod, Rocker Arm
...

Rocker Arm Removal
Squeeze the brake lever slowly and hold it with a band. Remove the front footpeg bracket bolts. Raise the rear wheel off the ground with the jack (see Rear Shock Absorber Removal). Special ...

Other materials:

Oil Level Inspection
Check that the engine oil level is between the upper [A] and lower [B] levels in the gauge. NOTE Situate the motorcycle so that it is perpendicular to the ground. If the motorcycle has just been used, wait several minutes for all the oil to drain down. If the oil has just been changed, ...

Transmission Assy Assembly
Install the ball bearing [A] until it is bottomed. Turn the oil seal side to the bottom. Special Tool - Bearing Driver Set: 57001-1129 Install the bearing holder [B]. Turn the flat side to the bottom. Apply a non-permanent locking agent to the bearing holder bolts [C]. Tighten: ...

Engine Oil Flow Chart
1. Oil Screen 2. Oil Pump 3. Oil Pressure Relief Valve 4. Oil Filter 5. Oil Pipe 6. Oil Cooler 7. Balancer Oil Passage 8. Main Oil Passage 9. Crankshaft Oil Passage 10. Oil Pressure Switch 11. Camshaft Oil Passages 12. Drive Shaft Oil Passage 13. Output Shaft Oil Passage 14. Starter ...