Kawasaki Ninja Service Manual: Camshaft Chain Installation

Kawasaki Ninja Service Manual / Engine Top End / Camshaft, Camshaft Chain / Camshaft Chain Installation

Camshaft Chain Installation


Camshaft Chain Removal
Remove: Camshafts (see Camshaft Removal) Timing Rotor (see Timing Rotor Removal in the Electrical System chapter) Front and Rear Camshaft Chain Guides (see Cylinder Head Removal) Remove ...

Cylinder Head
...

Other materials:

Spring Preload Adjustment
Remove the rear shock absorber from the frame (see Rear Shock Absorber Removal). Loosen the locknut and turn out the adjusting nut to free the spring. Special Tools - Hook Wrench T=3.2 R37: 57001-1539 Hook Wrench R=35: 57001-1580 To adjust the spring preload, turn in the adjusting n ...

Stick Coil Primary Peak Voltage Inspection
NOTE Be sure the battery is fully charged. Remove the stick coils (see Stick Coil Removal). Do not remove the spark plugs. Connect the ECU to the harness. Measure the primary peak voltage as follows. Install the new spark plug [A] into each stick coil [B], and ground them onto ...

Gear Position Switch Removal
Remove: Oil Pump (see Oil pump Removal in the Engine Lubrication System chapter) Engine Sprocket (see Engine Sprocket Removal in the Final Drive chapter) Fuel Tank (see Fuel Tank Removal in the Fuel System (DFI) chapter) Disconnect the connector [A]. Remove: Screws [A] ...