Kawasaki Ninja Service Manual: Camshaft Chain Installation

Kawasaki Ninja Service Manual / Engine Top End / Camshaft, Camshaft Chain / Camshaft Chain Installation

Camshaft Chain Installation


Camshaft Chain Removal
Remove: Camshafts (see Camshaft Removal) Timing Rotor (see Timing Rotor Removal in the Electrical System chapter) Front and Rear Camshaft Chain Guides (see Cylinder Head Removal) Remove ...

Cylinder Head
...

Other materials:

US, CA and CAL Models
1. Hold the water hose [A]. Insert the tab into the slot. 2. Hold the water hose [B]. Insert the tab into the slot. 3. Water Hose Fitting on Cylinder Head 4. Heat Insulation Rubber Plate 5. Run the crankshaft sensor lead and the oil pressure switch lead into the slot, and hook the slot on ...

Break-in
The first 1 600 km (1 000 mi) that the motorcycle is ridden is designated as the break-in period. If the motorcycle is not used carefully during this period, you may very well end up with a “broken down” instead of a “broken in” motorcycle after a few thousand kilometers. The fol ...

Timing Rotor Installation
Install the timing rotor [A] on the crankshaft [B] with their teeth [C] aligned. Holding the timing rotor with the flywheel & pulley holder and tighten the bolt. Torque - Timing Rotor Bolt: 39 N·m (4.0 kgf·m, 29 ft·lb) Special Tool - Flywheel & Pulley Holder: 57001-1605 I ...