Kawasaki Ninja Service Manual: Camshaft Chain Installation

Kawasaki Ninja Service Manual / Engine Top End / Camshaft, Camshaft Chain / Camshaft Chain Installation

Camshaft Chain Installation


Camshaft Chain Removal
Remove: Camshafts (see Camshaft Removal) Timing Rotor (see Timing Rotor Removal in the Electrical System chapter) Front and Rear Camshaft Chain Guides (see Cylinder Head Removal) Remove ...

Cylinder Head
...

Other materials:

Precautions
1) No need of topping-up No topping-up is necessary in this battery until it ends its life under normal use. Forcibly prying off the seal cap to add water is very dangerous. Never do that. 2) Refreshing charge. Give refresh charge for 5 to 10 hours with charge current shown in the text (see ...

Throttle Body Assy Installation
Apply a thin coat of grease to the throttle cable lower ends. Fit the accelerator cable end [A] and the decelerator cable end [B] into the throttle pulley. Install the clamp [C] securely. Install the throttle body assy holder clamp bolt heads [A] outside as shown in the figure. ...

Oil Pressure Measurement
Remove: Right Lower Fairing (see Lower Fairing Removal in the Frame chapter) Oil Passage Plug [A] Attach the adapter [A] and gauge [B] to the plug hole. Special Tools - Oil Pressure Gauge, 10 kgf/cm²: 57001-164 Oil Pressure Gauge Adapter, PT3/8: 57001 -1233 ...