Kawasaki Ninja Service Manual: Camshaft Chain Installation

Kawasaki Ninja Service Manual / Engine Top End / Camshaft, Camshaft Chain / Camshaft Chain Installation

Camshaft Chain Installation


Camshaft Chain Removal
Remove: Camshafts (see Camshaft Removal) Timing Rotor (see Timing Rotor Removal in the Electrical System chapter) Front and Rear Camshaft Chain Guides (see Cylinder Head Removal) Remove ...

Cylinder Head
...

Other materials:

Piston Ring, Piston Ring Groove Wear Inspection
Check for uneven groove wear by inspecting the ring seating. The rings should fit perfectly parallel to groove surfaces. If not, replace the piston and all the piston rings. With the piston rings in their grooves, make several measurements with a thickness gauge [A] to determine pisto ...

Engine No.  ZXT00JE003022
1. Heat Insulation Rubber Plate 2. For Air Switching Valve Hoses (Place the air switching valve above the rubber plate.) 3. For Air Suction Valve Cover 4. For Throttle Body Assy Holder #2 and #3 5. For Throttle Body Assy Holder #1 6. For Water Temperature Sensor 7. Insert the tab into th ...

Stem, Stem Bearing Installation
Replace the bearing outer races with new ones. Drive them into the head pipe at the same time. Special Tools - Head Pipe Outer Race Press Shaft [A]: 57001-1075 Head Pipe Outer Race Driver, 55 [B]: 57001 -1446 or Bearing Driver Set: 57001-1129 Apply grease to the outer races. ...