Kawasaki Ninja Service Manual: Camshaft, Camshaft Chain

Kawasaki Ninja Service Manual / Engine Top End / Camshaft, Camshaft Chain

Camshaft Chain Tensioner Installation
Replace the O-ring [A] with a new one. Apply grease to the new O-ring. Release the stopper [B] and push the push rod [C] into the interior of the tensioner body [D] so that the position of th ...

Camshaft Removal
Remove: Cylinder Head Cover (see Cylinder Head Cover Removal) Crankshaft Sensor Cover (see Crankshaft Sensor Removal in the Electrical System chapter) Using a wrench on the timing rotor bol ...

Other materials:

Intake Air Temperature Sensor Output Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Remove the fuel tank (see Fuel Tank Removal in the Fuel System (DFI) chapter). Disconnect the intake air temperature sensor connector and connect the measuring adapter [A] between these connectors as shown in ...

Wheel Rotation Sensor Air Gap Inspection
Raise the front/rear wheel off the ground (see Front/Rear Wheel Removal in the Wheels/Tires chapter). Measure the air gap between the sensor and sensor rotor at several points by turning the wheel slowly. Thickness Gauge [A] Wheel Rotation Sensor Air Gap Standard: Front 0.4 1.6 mm ...

Starter Motor Installation
NOTICE Do not tap the starter motor shaft or body. Tapping the shaft or body could damage the motor. Clean the starter motor legs [A] and crankcase where the starter motor is ground. Replace the O-ring [A] with a new one. Apply grease to the new O-ring. Tighten: Torque - Starter ...