Operating Procedures
Throttle Body Assy Holder RemovalIdle Speed Control Valve Actuator Input Voltage Inspection
NOTE
Be sure the battery is fully charged.
Turn the ignition switch to OFF.
Disconnect the idle speed control valve actuator connector
and connect a suitable measuring leads [A] between
these connectors as shown in the figure.
Main Harness [B]
Idle Speed Control Valve Actua ...
Rear Master Cylinder Removal
Unscrew the brake hose banjo bolt [A] and remove the
brake hose (see Brake Hose and Pipe Replacement in
the Periodic Maintenance chapter).
Remove:
Rear Master Cylinder Mounting Bolts [B]
Foot Guard [C]
Screw and Stopper [D]
Bolt [E]
Front Footpeg Bracket Bolts [F]
Cable Guide [G ...
Break-in
The first 1 600 km (1 000 mi) that the motorcycle is ridden is designated
as the
break-in period. If the motorcycle is not used carefully during this period, you
may
very well end up with a “broken down” instead of a “broken in” motorcycle after
a
few thousand kilometers.
The fol ...