Kawasaki Ninja Service Manual: Throttle Body Assy Holder

Kawasaki Ninja Service Manual / Engine Top End / Throttle Body Assy Holder

Operating Procedures
Clean the seat area carefully. Coat the seat with machinist’s dye. Fit a 45° cutter into the holder and slide it into the valve guide. Press down lightly on the handle and turn it right ...

Throttle Body Assy Holder Removal
Remove: Throttle Body Assy (see Throttle Body Assy Removal in the Fuel System (DFI) chapter) Clamps [A] Loosen the throttle body assy holder bolts as shown sequence [1 3] in the figure, ...

Other materials:

Stator Coil Installation
Apply a non-permanent locking agent to the threads of the stator coil bolts and tighten them. Torque - Stator Coil Bolts: 12 N·m (1.2 kgf·m, 106 in·lb) Using a high flash-point solvent, clean off any oil or dirt that may be on the silicone sealant coating area. Dry them with a clea ...

Subthrottle Valve Actuator Input Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Disconnect the subthrottle valve actuator connector and connect the measuring adapter [A] between these connectors as shown in the figure. Main Harness [B] Subthrottle Valve Actuator [C] Special Tool ...

Stem, Stem Bearing Installation
Replace the bearing outer races with new ones. Drive them into the head pipe at the same time. Special Tools - Head Pipe Outer Race Press Shaft [A]: 57001-1075 Head Pipe Outer Race Driver, 55 [B]: 57001 -1446 or Bearing Driver Set: 57001-1129 Apply grease to the outer races. ...