
ESD (Electronic Steering Damper) ECU Removal (ZX1000JD/KD)
Steering StemFor Secondary Fuel Injectors
Remove the fuel tank (see Fuel Tank Removal).
Disconnect the secondary fuel injector connector [A].
Connect a digitalmeter to the terminals in each secondary
fuel injector [A].
Measure the secondary fuel injector resistance.
Secondary Fuel Injector Resistance
Standard: Abo ...
Check 3-3: High Beam Indicator Light (LED) Inspection
Connect the leads in the same circuit as Check 3-2.
Connect the terminal [7] to the battery (+) terminal.
Check that the high beam indicator light (LED) [A] goes
on.
If the indicator light does not go on, replace the meter unit.
...
Lights and Switches Operation Inspection
First Step
Set the gear position in the neutral position.
Turn the ignition switch to ON.
The following lights should go on according to below table.
If the following light does not go on, inspect the meter
unit (see Meter Unit Inspection in the Electrical System
chapter).
...