Gear Position Switch Resistance Inspection
If the reading is as the specified, check the output voltage (see Gear Position Switch Output Voltage Inspection).
Gear Position Switch Output Voltage InspectionRocker Arm Installation
Install the both rocker arms [A] so that their marks [B] face
left side.
Replace the tie-rod nut, rear shock absorber nut and
rocker arm nut with new ones.
Apply grease to the inside of the oil seals.
Tighten:
Torque - Rocker Arm Nut: 34 N·m (3.5 kgf·m, 25 ft·lb)
Tie-Rod ...
Coolant Change
WARNINGCoolant can be extremely hot and cause
severe
burns, is toxic and very slippery. Do not remove
the radiator cap or attempt to change the coolant
when the engine is hot; allow it cool completely.
Immediately wipe any spilled coolant from tires,
frame, engine or othe ...
Solenoid Valve Inspection (Service Code b 13, b 14, b 17, b 18)
The solenoid valve is built in the KIBS Hydraulic Unit [A].
Therefore the solenoid valve cannot be checked directly.
Perform the Pre-Diagnosis Inspection 1 and 2 (see Inquiries
to Rider in the Brakes chapter).
If any of these service codes appears even if all checks
are ended, replace t ...