Gear Position Switch Resistance Inspection
If the reading is as the specified, check the output voltage (see Gear Position Switch Output Voltage Inspection).
Gear Position Switch Output Voltage InspectionConnecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
Spark Plugs
The standard spark plug is shown in
the table. The spark plugs should be
replaced in accordance with the Periodic
Maintenance Chart.
Spark plug removal should be done
only by a competent mechanic following
the instructions in the Service Manual.
Spark Plug
A. Plug Gap ...
KIBS Hydraulic Unit Installation
NOTICE
Brake fluid quickly ruins painted plastic surfaces;
any spilled fluid should be completely washed away
immediately.
Install the KIBS hydraulic unit together with the bracket.
Before installing the brake pipe, check to see that there is
no damage on the threads of the brake pipe joi ...