Kawasaki Ninja Service Manual: Gear Position Switch (Service Code 25)

Kawasaki Ninja Service Manual / Self-Diagnosis System / Gear Position Switch (Service Code 25)

Rear Wheel Rotation Sensor Signal (Service Code 24)
Rear Wheel Rotation Sensor Signal Inspection The rear wheel rotation sensor sends the signal to the ECU through the KIBS hydraulic unit (KIBS equipped models). For other than KIBS equipped models, ...

Gear Position Switch Removal/Installation
Refer to the Gear Position Switch Removal/Installation in the Electrical System chapter. Gear Position Switch Resistance Inspection Refer to the Gear Position Switch Inspection in the Elec ...

Other materials:

Timing Rotor Installation
Install the timing rotor [A] on the crankshaft [B] with their teeth [C] aligned. Holding the timing rotor with the flywheel & pulley holder and tighten the bolt. Torque - Timing Rotor Bolt: 39 N·m (4.0 kgf·m, 29 ft·lb) Special Tool - Flywheel & Pulley Holder: 57001-1605 I ...

Crankshaft Main Bearing Insert/Journal Wear Inspection
Split the crankcase (see Crankcase Splitting). Cut strips of plastigage to journal width. Place a strip on each journal parallel to the crankshaft installed in the correct position. Tighten the crankcase bolts to the specified torque (see Crankcase Assembly). NOTE Do not turn ...

Special Tools
Bearing Driver Set: 57001-1129 Jack: 57001-1238 Bearing Remover Head, 25 × 28: 57001-1346 Bearing Remover Shaft, 13: 57001-1377 Jack Attachment: 57001-1608 ...