Kawasaki Ninja Service Manual: Rear Frame Front Installation

Kawasaki Ninja Service Manual / Frame / Frame / Rear Frame Front Installation

Torque - Rear Frame Front Bolts: 44 N·m (4.5 kgf·m, 32 ft·lb)

Rear Footpeg Bracket Bolts: 25 N·m (2.5 kgf·m, 18 ft·lb)

Muffler Body Mounting Bolt: 25 N·m (2.5 kgf·m, 18 ft·lb)

Rear Frame Front Removal
Remove: Rear Frame Rear (see Rear Frame Rear Removal) Rear Fender Front (see Rear Fender Front Removal) Rear Footpeg Bracket Bolts [A] Rear Footpeg Bracket [B] Rear Frame Front Bolts [C] ...

Frame Inspection
Visually inspect the frame for cracks, dents, bending, or warp. If there is any damage to the frame, replace it. WARNINGA repaired frame may fail in use, possibly causing an acc ...

Other materials:

Exploded View
HG: Apply high-temperature grease. HO: Apply heavy oil. L: Apply a non-permanent locking agent. MO: Apply molybdenum disulfide oil solution. (mixture of the engine oil and molybdenum disulfide grease in a weight ratio 10:1) R: Replacement Parts Specifications Special Too ...

Throttle Body Assy Removal
WARNINGGasoline is extremely flammable and can be explosive under certain conditions, creating the potential for serious burns. Make sure the area is well-ventilated and free from any source of flame or sparks; this includes any appliance with a pilot light. Do not smoke. T ...

Rocker Arm/Tie-Rod Bearing, Sleeve Inspection
NOTICE Do not remove the bearings for inspection. Removal may damage them. Visually inspect the rocker arm, or tie-rod sleeves [A] and needle bearings [B]. The rollers in a needle bearing normally wear very little, and wear is difficult to measure. Instead of measuring, inspect the ...