Torque - Premuffler Chamber Mounting Bolt: 34 N·m (3.5 kgf·m, 25 ft·lb)

Premuffler Chamber Removal
Exhaust Pipe RemovalBreak-in
The first 1 600 km (1 000 mi) that the motorcycle is ridden is designated
as the
break-in period. If the motorcycle is not used carefully during this period, you
may
very well end up with a “broken down” instead of a “broken in” motorcycle after
a
few thousand kilometers.
The fol ...
Fuel Flow Rate Inspection
WARNINGGasoline is extremely flammable and can be
explosive
under certain conditions, creating the
potential for serious burns. Make sure the area is
well-ventilated and free from any source of flame
or sparks; this includes any appliance with a pilot
light. Do not smoke. T ...
Spark Plug Replacement
Remove the stick coils (see Stick Coil Removal in the
Electrical System chapter).
Remove the spark plugs using the 16 mm (0.63 in.) plug
wrench [A] vertically.
Replace the spark plug with new ones.
Standard Spark Plug
Type: NGK CR9EIA-9
Insert the spark plug vertically into the sp ...