Water Temperature Sensor
Exploded ViewExploded View
10. US, CA, CAL and AU Models
11. ZX1000JD/KD
G: Apply grease.
L: Apply a non-permanent locking agent.
R: Replacement Parts
S: Follow the specified tightening sequence.
1. US, CA and CAL Models
2. ZX1000J Model
3. ZX1000K Model
4. AU Model
5. Face the large diameter side re ...
Exhaust Pipe Installation
Replace the exhaust pipe gaskets [A] and premuffler
chamber gasket [B] with new ones.
Install the premuffler chamber gasket to the premuffler
chamber [C] until it is bottomed so that the chamfer side
faces exhaust pipe [D].
Install the exhaust pipe clamp [E] as shown in the figure.
I ...
Check 3-3: High Beam Indicator Light (LED) Inspection
Connect the leads in the same circuit as Check 3-2.
Connect the terminal [7] to the battery (+) terminal.
Check that the high beam indicator light (LED) [A] goes
on.
If the indicator light does not go on, replace the meter unit.
...