Kawasaki Ninja Service Manual: Throttle Body Assy Assembly

Kawasaki Ninja Service Manual / Fuel System (DFI) / Throttle Body Assy / Throttle Body Assy Assembly

Throttle Body Assy Assembly


Insert the joint pipe so that the short side [D] faces right side.

Left and right delivery pipes are identical.

Throttle Body Assy Assembly


Throttle Body Assy Assembly


Throttle Body Assy Disassembly
1. Throttle Body Assy 2. Subthrottle Valve Actuator 3. Idle Speed Control Valve Actuator 4. Main Throttle Sensor 5. Subthrottle Sensor 6. Primary Fuel Injectors 7. Delivery Pipe Assy NOTICE ...

Nozzle Assy
...

Other materials:

Shift Pedal Installation
Install the rubber damper to the shift pedal. Turn the chamfered side to inside. Assemble: Shift Lever [A] and Locknut [B] (Left-hand Thread) Shift Pedal [C] and Locknut [D] Tie-Rod [E] Turn the grooved end [F] of the tie-rod to the shift lever. Apply grease to the sliding ...

Oil Pump Drive Gear Shaft Installation
Apply molybdenum disulfide grease [A] to the oil pump drive gear shaft. Apply molybdenum disulfide oil solution to the followings. Transmission Case [B] Crankcase [C] Install the oil pump drive gear shaft and washer [D] as shown in the figure. Install the new circlip [E] into the ...

Oil Pressure Relief Valve Inspection
Remove the oil pressure relief valve (see Oil Pressure Relief Valve Removal). Check to see if the valve [A] slides smoothly when pushing it in with a wooden or other soft rod, and see if it comes back to its seat by spring [B] pressure. NOTE Inspect the valve in its assembled stat ...