Kawasaki Ninja Service Manual: Throttle Body Assy Assembly

Kawasaki Ninja Service Manual / Fuel System (DFI) / Throttle Body Assy / Throttle Body Assy Assembly

Throttle Body Assy Assembly


Insert the joint pipe so that the short side [D] faces right side.

Left and right delivery pipes are identical.

Throttle Body Assy Assembly


Throttle Body Assy Assembly


Throttle Body Assy Disassembly
1. Throttle Body Assy 2. Subthrottle Valve Actuator 3. Idle Speed Control Valve Actuator 4. Main Throttle Sensor 5. Subthrottle Sensor 6. Primary Fuel Injectors 7. Delivery Pipe Assy NOTICE ...

Nozzle Assy
...

Other materials:

Sidestand Installation
Replace the sidestand nut [A] with a new one. Apply grease to the sliding areas [B]. Tighten the sidestand bolt [C] first, and then the sidestand nut. Torque - Sidestand Bolt: 44 N·m (4.5 kgf·m, 32 ft·lb) Sidestand Nut: 29 N·m (3.0 kgf·m, 21 ft·lb) Install the spring [D] as sh ...

Wiring Diagram (Other than US, CA and CAL with KIBS Models)
ZX1000KC ZX1000KD ...

Chassis Parts Lubrication
Before lubricating each part, clean off any rusty spots with rust remover and wipe off any grease, oil, dirt, or grime. Lubricate the points listed below with indicated lubricant. NOTE Whenever the vehicle has been operated under wet or rainy conditions, or especially after using a high ...