Kawasaki Ninja Service Manual: Nozzle Assy

Kawasaki Ninja Service Manual / Fuel System (DFI) / Nozzle Assy

Throttle Body Assy Assembly
Before assembling, blow away dirt or dust from the throttle body and delivery pipe assy by applying compressed air. Replace the O-rings [A] of the joint pipe [B] with new ones. Apply engine o ...

Nozzle Assy Removal
Remove the fuel tank (see Fuel Tank Removal). Disconnect the secondary fuel hose [A] from the delivery pipe assy of the nozzle assy [B] (see Fuel Hose Replacement in the Periodic Maintenance ...

Other materials:

Nozzle Assy Assembly
Before assembling, blow away dirt or dust from the delivery pipes [A] by applying compressed air [B]. Replace the O-rings [A] of the joint pipe [B] with new ones. Apply engine oil to the new O-rings, and insert it to the delivery pipes [C] Insert the joint pipe so that the step ...

Special Tools and Sealant
Oil Pressure Gauge, 5 kgf/cm²: 57001-125 Hand Tester: 57001-1394 Needle Adapter Set: 57001-1457 Extension Tube: 57001-1578 Fuel Pressure Gauge Adapter: 57001-1593 Fuel Hose: 57001-1607 Measuring Adapter: 57001-1700 Liquid Gasket, TB1211: 56019-120 ...

Release Shaft Installation
Apply grease to the oil seal lips on the upper ridge of the clutch cover. Apply engine oil to the needle bearings in the hole of the clutch cover. Applymolybdenum disulfide grease to the pusher-holding portion [A] on the release shaft. Install the washer [B] and spring [C]. ...