Throttle Body Assy Assembly
Nozzle Assy RemovalMeter Unit Circuit (ZX1000K Model)
1. Ignition Switch
2. Joint Connector F
3. Stop Watch Button
4. Oil Pressure Switch
5. Crankshaft Sensor
6. Water Temperature Sensor
7. Gear Position Switch
8. Intake Air Temperature Sensor
9. ESD ECU (ZX1000JD/KD)
10. ECU
11. Rear Wheel Rotation Sensor
12. Frame Ground 1
13. Engine ...
Precautions
There are a number of important precautions that are
musts when servicing electrical systems. Learn and observe
all the rules below.
Do not reverse the battery cable connections. This will
burn out the diodes on the electrical parts.
Always check battery condition before condemning other
...
Check 3-3: High Beam Indicator Light (LED) Inspection
Connect the leads in the same circuit as Check 3-2.
Connect the terminal [7] to the battery (+) terminal.
Check that the high beam indicator light (LED) [A] goes
on.
If the indicator light does not go on, replace the meter unit.
...