Kawasaki Ninja Service Manual: Tie-Rod Removal

Kawasaki Ninja Service Manual / Suspension / Tie-Rod, Rocker Arm / Tie-Rod Removal

Tie-Rod Removal


Tie-Rod Removal


Tie-Rod Removal


Tie-Rod Installation

Tie-Rod, Rocker Arm
...

Rocker Arm Removal
Squeeze the brake lever slowly and hold it with a band. Remove the front footpeg bracket bolts. Raise the rear wheel off the ground with the jack (see Rear Shock Absorber Removal). Special ...

Other materials:

Valve Guide Installation
Apply engine oil to the valve guide outer surface before installation. Heat the area around the valve guide hole to about 120 150°C (248 302°F). NOTICE Do not heat the cylinder head with a torch. This will warp the cylinder head. Soak the cylinder head and heat the oil. Usin ...

Fuel Pump Relay Inspection
Refer to the Relay Circuit Inspection in the Electrical System chapter. If the fuel pump relay is normal, check the wiring to the fuel pump relay (see Fuel Pump Relay Circuit). Special Tool - Hand Tester: 57001-1394 If the wiring is good, check the ECU for its ground and power supply (se ...

Brake Hose and Pipe Damage and Installation Condition Inspection
Inspect the brake hoses, pipes and fittings for deterioration, cracks and signs of leakage. The high pressure inside the brake line can cause fluid to leak [A] or the hose to burst if the line is not properly maintained. Bend and twist the rubber hose while examining it. Replace the ...