Air Cleaner Element Removal/Installation
Nozzle Assy Assembly
Air Cleaner Element InspectionAir Switching Valve
Air Switching Valve Operation Test
Refer to the Air Suction System Damage Inspection in the
Periodic Maintenance chapter.
Air Switching Valve Unit Test
Remove the air switching valve (see Air Switching Valve
Removal in the Engine Top End chapter).
Set the hand tester [A] to the × 1 ...
Throttle Body Assy Installation
Apply a thin coat of grease to the throttle cable lower ends.
Fit the accelerator cable end [A] and the decelerator cable
end [B] into the throttle pulley.
Install the clamp [C] securely.
Install the throttle body assy holder clamp bolt heads [A]
outside as shown in the figure.
...
Brake Light Switches
When either the front or rear brake is
applied, the brake light goes on. The
front brake light switch requires no adjustment,
but the rear brake light switch
should be adjusted in accordance with
the Periodic Maintenance Chart.
Inspection
Turn the ignition key to “ON”.
The brake ligh ...