Special Tools and Sealants
Crankcase SplittingPremuffler Chamber Installation
Replace the premuffler chamber gasket [A] with a new
one.
Install the premuffler chamber gasket to the premuffler
chamber [B] until it is bottomed so that the chamfer side
faces exhaust pipe [C].
Install the exhaust pipe clamp [D] as shown in the figure.
Insert the projection [E] into ...
Bolt and Nut Tightening
In accordance with the Periodic Maintenance Chart, it is very important to
check
the tightness of the bolts and nuts listed here. Also, check to see that each
cotter
pin is in place and in good condition. Please ask your authorized Kawasaki
dealer
for torque values.
1. Clutch Lever Hol ...
Oil Pan Installation
If the oil filter holder bolt [A] was removed, tighten it.
Apply a non-permanent locking agent to the threads of
the oil filter holder bolt.
Torque - Oil Filter Holder Bolt: 35 N·m (3.6 kgf·m, 26 ft·lb)
Replace the O-rings [B] with new ones, and apply grease
to them.
Install the O-ri ...