Kawasaki Ninja Service Manual: Crankshaft/Connecting Rod Cleaning

Kawasaki Ninja Service Manual / Crankshaft/Transmission / Crankshaft and Connecting Rods / Crankshaft/Connecting Rod Cleaning

Connecting Rod Installation
NOTICE To minimize vibration, the connecting rods should have the same weight mark. Big End Cap [A] Connecting Rod [B] Weight Mark, Alphabet [C] Diameter Mark [D] (“” or No Mark) NOTICE ...

Connecting Rod Bend Inspection
Remove the connecting rod big end bearing inserts, and reinstall the connecting rod big end cap. Select an arbor [A] of the same diameter as the connecting rod big end, and insert the arbor t ...

Other materials:

ESD (Electronic Steering Damper) ECU Removal (ZX1000JD/KD)
NOTICE Never drop the ECU especially on a hard surface. Such a shock to the ECU can damage it. Lift up the front portion of the fuel tank, and hold it with a suitable bar or block (see Fuel Tank Removal in the Fuel System (DFI) chapter). NOTE When removing the ESD ECU only, there ...

Air Suction System Damage Inspection
Separate the air switching valve hose [A] from the lower air cleaner housing [B] (see Air Cleaner Housing Removal in the Fuel System (DFI) chapter). Connect the following parts temporarily. Fuel Pump Lead Connector [A] Extension Tube [B] Air Cleaner Housing (see Air Cleaner Hou ...

Stop Watch
The stop watch can be used in closed course competition. The stop watch is operated as follows: Push the upper button to display the stop watch. To start the stop watch, push the “START/STOP” switch on the right handlebar switch to the left. A. “START/STOP” Switch ...