Kawasaki Ninja Service Manual: Crankshaft and Connecting Rods

Kawasaki Ninja Service Manual / Crankshaft/Transmission / Crankshaft and Connecting Rods

Crankcase Halves Assembly
Install: Crankshaft (see Crankshaft Installation) Connecting Rods (see Connecting Rod Installation) Using a cleaning fluid, clean off any oil or dirt on the mating surface of the crankcase ...

Crankshaft Removal
Split the crankcase (see Crankcase Splitting). Remove: Connecting Rod Big End Nuts [A] Connecting Rod Big End Caps [B] NOTE Mark and record the locations of the connecting rods and their ...

Other materials:

CAN Communication Line
CAN Communication Line Resistance Inspection In this model, resistors for CAN communication line are built in the ECU [A] and meter unit. Refer to the Meter Unit Inspection in the Electrical System chapter for the resistor in the meter unit. Turn the ignition switch to OFF. Remove: EC ...

Air Suction Valve Inspection
Remove the air suction valve (see Air Suction Valve Removal). Visually inspect the reeds [A] for cracks, folds, warps, heat damage or other damage. If there is any doubt as to the condition of the reeds, replace the air suction valve as an assembly. Check the reed contact areas [B] of ...

Engine No.  ZXT00JE003022
1. Heat Insulation Rubber Plate 2. For Air Switching Valve Hoses (Place the air switching valve above the rubber plate.) 3. For Air Suction Valve Cover 4. For Throttle Body Assy Holder #2 and #3 5. For Throttle Body Assy Holder #1 6. For Water Temperature Sensor 7. Insert the tab into th ...