ECU Communication Error (Service Code 39)
Fuel Pump Relay Removal/InstallationShift Pedal Installation
Install the rubber damper to the shift pedal.
Turn the chamfered side to inside.
Assemble:
Shift Lever [A] and Locknut [B] (Left-hand Thread)
Shift Pedal [C] and Locknut [D]
Tie-Rod [E]
Turn the grooved end [F] of the tie-rod to the shift lever.
Apply grease to the sliding ...
Valve Guide Installation
Apply engine oil to the valve guide outer surface before
installation.
Heat the area around the valve guide hole to about 120
150°C (248 302°F).
NOTICE
Do not heat the cylinder head with a torch. This will
warp the cylinder head. Soak the cylinder head and
heat the oil.
Usin ...
Rear Shock Absorber Scrapping
WARNINGPressurized nitrogen may explode when
heated.
The rear shock contains nitrogen gas. To avoid
an explosion, do not incinerate the shock body
without first releasing the nitrogen and removing
the shraeder valve.
Remove the rear shock absorber (see Rear Shock Ab ...