Kawasaki Ninja Service Manual: Nozzle Assy Removal

Kawasaki Ninja Service Manual / Fuel System (DFI) / Nozzle Assy / Nozzle Assy Removal

Nozzle Assy Removal


Nozzle Assy
...

Nozzle Assy Installation
Replace the dust seals [A] with new ones. Apply engine oil to the new dust seals, and install them. Install the nozzle assy securely. Push the four mounting positions of the injectors. Set ...

Other materials:

Idle Speed Control Valve Actuator Removal
NOTICE Never drop the idle speed control valve actuator especially on a hard surface. Such a shock to the actuator can damage it. Remove: Throttle Body Assy (see Throttle Body Assy Removal in the Fuel System (DFI) chapter) Idle Speed Control Valve Actuator Retainer Screws [A] Idle Spe ...

Front Wheel Rotation Sensor Signal (Service Code 27)
Front Wheel Rotation Sensor Signal Inspection The front wheel rotation sensor sends the signal to the ECU through the KIBS hydraulic unit (KIBS equipped models). For other than KIBS equipped models, the signal is sent directly to the ECU. The ECU uses the wheel rotation sensor signal for KTRC ...

Shift Pedal Installation
Install the rubber damper to the shift pedal. Turn the chamfered side to inside. Assemble: Shift Lever [A] and Locknut [B] (Left-hand Thread) Shift Pedal [C] and Locknut [D] Tie-Rod [E] Turn the grooved end [F] of the tie-rod to the shift lever. Apply grease to the sliding ...