Kawasaki Ninja Service Manual: Nozzle Assy

Kawasaki Ninja Service Manual / Fuel System (DFI) / Nozzle Assy

Throttle Body Assy Assembly
Before assembling, blow away dirt or dust from the throttle body and delivery pipe assy by applying compressed air. Replace the O-rings [A] of the joint pipe [B] with new ones. Apply engine o ...

Nozzle Assy Removal
Remove the fuel tank (see Fuel Tank Removal). Disconnect the secondary fuel hose [A] from the delivery pipe assy of the nozzle assy [B] (see Fuel Hose Replacement in the Periodic Maintenance ...

Other materials:

Axle Inspection
Remove the front and rear axles (see Front/Rear Wheel Removal). Visually inspect the front and rear axle for damages. If the axle is damaged or bent, replace it. Place the axle in V blocks that are 100 mm (3.94 in.) [A] apart, and set a dial gauge [B] on the axle at a point halfway ...

DFI Power Source
ECU Fuse Removal Refer to the 30 A Main/15 A ECU Fuse Removal in the Electrical System chapter. ECU Fuse Installation If a fuse fails during operation, inspect the DFI system to determine the cause, and then replace it with a new fuse of proper amperage. Refer to the Fuse Installation in ...

Transmission Assy Installation
Assemble the transmission assy (see Transmission Assy Assembly). Be sure that the dowel pins are in position. Install the transmission assy on the crankcase. Tighten: Torque - Transmission Case Bolts: 20 N·m (2.0 kgf·m, 15 ft·lb) Install: Shift Shaft (see External Shift Mechani ...