Kawasaki Ninja Service Manual: Nozzle Assy

Kawasaki Ninja Service Manual / Fuel System (DFI) / Nozzle Assy

Throttle Body Assy Assembly
Before assembling, blow away dirt or dust from the throttle body and delivery pipe assy by applying compressed air. Replace the O-rings [A] of the joint pipe [B] with new ones. Apply engine o ...

Nozzle Assy Removal
Remove the fuel tank (see Fuel Tank Removal). Disconnect the secondary fuel hose [A] from the delivery pipe assy of the nozzle assy [B] (see Fuel Hose Replacement in the Periodic Maintenance ...

Other materials:

Main Throttle Sensor Output Voltage Inspection
Measure the output voltage at the main throttle sensor in the same way as input voltage inspection, note the following. Disconnect the main throttle sensor connector and connect the setting adapter [A] between these connectors. Special Tool - Throttle Sensor Setting Adapter: 57001 -15 ...

Piston Ring Groove Width Inspection
Measure the piston ring groove width. Use a vernier caliper at several points around the piston. Piston Ring Groove Width Standard: Top [A] 0.82 0.84 mm (0.0323 0.0331 in.) Second [B] 0.82 0.84 mm (0.0323 0.0331 in.) Service Limit: 0.92 mm (0.036 in.) Second 0.92 mm (0.036 in.) ...

Ball Bearing and Needle Bearing
Do not remove pressed ball or needle unless removal is absolutely necessary. Replace with new ones whenever removed. Press bearings with the manufacturer and size marks facing out. Press the bearing into place by putting pressure on the correct bearing race as shown. Pressing the incorrect ra ...