Kawasaki Ninja Service Manual: Nozzle Assy

Kawasaki Ninja Service Manual / Fuel System (DFI) / Nozzle Assy

Throttle Body Assy Assembly
Before assembling, blow away dirt or dust from the throttle body and delivery pipe assy by applying compressed air. Replace the O-rings [A] of the joint pipe [B] with new ones. Apply engine o ...

Nozzle Assy Removal
Remove the fuel tank (see Fuel Tank Removal). Disconnect the secondary fuel hose [A] from the delivery pipe assy of the nozzle assy [B] (see Fuel Hose Replacement in the Periodic Maintenance ...

Other materials:

Connecting Rod Twist Inspection
With the big-end arbor [A] still on V block [C], hold the connecting rod horizontally and measure the amount that the arbor [B] varies from being paralleled with the surface plate over a 100 mm (3.94 in.) length of the arbor to determine the amount of connecting rod twist. If the conne ...

Wheel Rotation Sensor Air Gap Inspection
Raise the front/rear wheel off the ground (see Front/Rear Wheel Removal in the Wheels/Tires chapter). Measure the air gap between the sensor and sensor rotor at several points by turning the wheel slowly. Thickness Gauge [A] Wheel Rotation Sensor Air Gap Standard: Front 0.4 1.6 mm ...

Sidestand Installation
Replace the sidestand nut [A] with a new one. Apply grease to the sliding areas [B]. Tighten the sidestand bolt [C] first, and then the sidestand nut. Torque - Sidestand Bolt: 44 N·m (4.5 kgf·m, 32 ft·lb) Sidestand Nut: 29 N·m (3.0 kgf·m, 21 ft·lb) Install the spring [D] as sh ...