Drive Chain Removal/Installation
Engine Sprocket RemovalConnecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
Fuel Reserve Switch Inspection
Fill the fuel tank with fuel and close the fuel tank cap.
Remove the front seat (see Front Seat Removal in the
Frame chapter).
Disconnect the fuel pump lead connector [A].
Connect the test light [A] (12 V 3.4 W bulb in a socket
with leads) and the 12 V battery [B] to the fuel pu ...
Brake Fluid Level Inspection
Check that the brake fluid level in the front brake reservoir
[A] is above the lower level line [B].
NOTE
Hold the reservoir horizontal by turning the handlebar
when checking brake fluid level.
If the fluid level is lower than the lower level line, fill the
reservoir to the upper lev ...