Brake Disc Warp Inspection
Brake Fluid Level InspectionConnecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
Throttle Body Assy Holder Installation
Be sure to install the new O-rings [A].
Using a high flash-point solvent, clean off any oil or dirt
that may be on the silicone sealant coating area. Dry
them with a clean cloth.
Apply silicone sealant to any two positions of the new O
-ring.
Sealant - Liquid Gasket, TB1211F: 92104-0 ...
Exhaust Butterfly Valve Cable Installation
Confirm whether pulley [A] is an angle shown in the figure.
41.7° ±7° [B]
This position is original position of the pulley.
NOTE
Correct the position electrically after confirming the use
is discontinued and there is no damage when differing
from the angle of shown in the figure.
...