Kawasaki Ninja Service Manual: Brake Fluid

Kawasaki Ninja Service Manual / Brakes / Brake Fluid

Brake Disc Warp Inspection
Raise the wheel off the ground with the jack. Special Tools - Jack: 57001-1238 Jack Attachment: 57001-1608 For front disc inspection, turn the handlebar fully to one side. Set up a dial ...

Brake Fluid Level Inspection
Refer to the Brake Fluid Level Inspection in the Periodic Maintenance chapter. Brake Fluid Change Refer to the Brake Fluid Change in the Periodic Maintenance chapter. ...

Other materials:

Rear Fender Front Installation
Installation is the reverse of removal. Note the following. Run the harness, cables and leads correctly (see Cable, Wire, and Hose Routing section in the Appendix chapter). When installing the clamp [A] on the rear fender front [B], install it so that the clamp positions at near the ...

Handlebar Installation
Apply a non-permanent locking agent to the threads of the handlebar positioning bolts and tighten them. Torque - Handlebar Positioning Bolts: 9.8 N·m (1.0 kgf·m, 87 in·lb) Install the steering stem head with handlebars. Install the washer [A] and steering stem head nut [B]. Tighten: ...

Front Fork Installation (Each Fork Leg)
Install the fork so that the top plug end [A] as shown in the figure. 11 mm (0.43 in.) [B] Steering Stem Head [C] Tighten: Torque - Front Fork Clamp Bolts (Lower): 23 N·m (2.3 kgf·m, 17 ft·lb) NOTE Tighten the two lower front fork clamp bolts alternately two times to ensur ...