Gear Position Switch Resistance Inspection
If the reading is as the specified, check the output voltage (see Gear Position Switch Output Voltage Inspection).
Gear Position Switch Output Voltage InspectionStarter Motor Assembly
Install the positive brush assy [A] and the starter motor
terminal [B] as shown in the figure.
Replace the O-ring [C] with a new one, and install it.
Install:
Brush Springs [A]
Negative Brush Assy [B]
Turn the stopper side [C] to inside.
Tighten:
Torque - Brush Holder S ...
ECU Removal
NOTICE
Never drop the ECU especially on a hard surface.
Such a shock to the ECU can damage it.
Remove the upper air cleaner housing (see Air Cleaner
Element Replacement in the Periodic Maintenance chapter).
Lift up the ECU [A] with rubber protector [B] to disconnect
the connectors [C]. ...
Relay Circuit Inspection
Remove the relay box (see Relay Box Removal).
Check conductivity of the following numbered terminals
by connecting the hand tester and one 12 V battery to the
relay box as shown in the figure (see Relay Box Internal
Circuit in this section).
If the tester does not read as specified, re ...