Gear Position Switch Resistance Inspection
If the reading is as the specified, check the output voltage (see Gear Position Switch Output Voltage Inspection).
Gear Position Switch Output Voltage InspectionMud Guard Installation
Installation is the reverse of removal. Note the following.
Run the hose and lead correctly (see Cable, Wire, and
Hose Routing section in the Appendix chapter).
Check the brake line.
Apply a non-permanent locking agent to the threads of
the mud guard mounting bolts [A, B], and tighten them ...
Electrical Wiring
Wiring Inspection
Visually inspect the wiring for signs of burning, fraying,
etc.
If any wiring is poor, replace the damaged wiring.
Pull each connector [A] apart and inspect it for corrosion,
dirt, and damage.
If the connector is corroded or dirty, clean it carefully. If it
is da ...
Valve Removal
Remove the cylinder head (see Cylinder Head Removal).
Remove the valve lifter and shim.
Mark and record the valve lifter and shim locations so they
can be installed in their original positions.
Using the valve spring compressor assembly, remove the
valve.
Special Tools - Valve ...