Bearing Driver Set:
57001-1129 
Jack:
57001-1238 
Bearing Remover Head, 25 × 28:
57001-1346 
Bearing Remover Shaft, 13:
57001-1377 
Jack Attachment:
57001-1608
Exploded View
Wheels (Rims)Wiring Diagram (US, CA and CAL with KIBS Models)
ZX1000KC
ZX1000KD
...
Fuel Injector Output Voltage Inspection
NOTE
Be sure the battery is fully charged.
Turn the ignition switch to OFF.
Remove the ECU (see ECU Removal).
Do not disconnect the ECU connector
Connect a digital meter [A] to the connector (gray) [B] with
the needle adapter set.
Special Tool - Needle Adapter Set: 57001-1457
...
Idle Speed Inspection
Start the engine and warm it up thoroughly.
With the engine idling, turn the handlebar to both sides
[A].
If handlebar movement changes the idle speed, the
throttle cables may be improperly adjusted or incorrectly
routed, or damaged. Be sure to correct any of these
conditions before rid ...