Kawasaki Ninja Service Manual: Special Tools

Kawasaki Ninja Service Manual / Wheels/Tires / Special Tools

Bearing Driver Set: 57001-1129


Jack: 57001-1238


Bearing Remover Head, 25 × 28: 57001-1346


Bearing Remover Shaft, 13: 57001-1377


Jack Attachment:
57001-1608

Exploded View
AL: Tighten the two clamp bolts alternately two times to ensure even tightening torque. HG: Apply high-temperature grease. R: Replacement Parts WL: Apply soap and water solution or ru ...

Wheels (Rims)
...

Other materials:

Stem, Stem Bearing Removal
Remove: Upper Fairing Assembly (see Upper Fairing Assembly Removal in the Frame chapter) Front Fender (see Front Fender Removal in the Frame chapter) Front Wheel (see Front Wheel Removal in the Wheels/Tires chapter) Steering Stem Head with Handlebars (see Handlebar Removal) Fron ...

Piston Ring Thickness Inspection
Measure the piston ring thickness. Use the micrometer to measure at several points around the ring. Piston Ring Thickness Standard: Top [A] 0.77 0.79 mm (0.0303 0.0311 in.) Second [B] 0.78 0.79 mm (0.0307 0.0311 in.) Service Limit: Top 0.70 mm (0.0276 in.) Second 0.71 mm (0.0280 ...

Meter Operation Inspection
Check 1-1: Switching Inspection Turn the ignition switch to ON and check the following. The all LCD segments [A] appear for 3 seconds. The warning indicator light (Red LED) [B] goes on for 3 seconds and then goes off in a moment after that goes off. The warning indicator light (Yellow LED ...