External Shift Mechanism Inspection
Exploded ViewCrankshaft Installation
NOTE
If the crankshaft is replaced with a new one, refer to
the Connecting Rod Big End Bearing/Crankshaft Main
Bearing Insert Selection in the Specifications.
NOTICE
If the crankshaft, bearing inserts, or crankcase
halves are replaced with new ones, select the bearing
inserts and check cleara ...
Engine Sprocket Installation
Replace the sprocket washer and axle cotter pin.
Install the engine sprocket onto the output shaft.
Apply molybdenum disulfide oil solution to the threads
and seating surface of the engine sprocket nut.
Tighten:
Torque - Engine Sprocket Nut: 145 N·m (14.8 kgf·m, 107
ft·lb)
NOTE
...
Battery Ground
Before completing any service on the motorcycle, disconnect
the battery cables from the battery to prevent the engine
from accidentally turning over. Disconnect the ground
cable (–) first and then the positive (+). When completed
with the service, first connect the positive (+) cable to the
p ...