Kawasaki Ninja Service Manual: Coupling Bearing Installation

Kawasaki Ninja Service Manual / Final Drive / Sprocket, Coupling / Coupling Bearing Installation

Coupling Bearing Installation


Apply high-temperature grease to the grease seal lips.

Special Tool - Bearing Driver Set: 57001-1129

Coupling Bearing Removal
Remove: Coupling Grease Seal Circlip [A] Special Tool - Inside Circlip Pliers: 57001-143 Remove the bearing [A] by tapping from the wheel side. Special Tool - Bearing Driver Set ...

Coupling Bearing Inspection
Since the coupling bearing is made to extremely close tolerances, the clearance can not normally be measured. NOTE It is not necessary to remove the coupling bearing for inspection. If the bea ...

Other materials:

Water Temperature Sensor Output Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Remove the throttle body assy (see Throttle Body Assy Removal in the Fuel System (DFI) chapter). Disconnect the water temperature sensor connector and connect the measuring adapter [A] between these connectors ...

Check 3-3: High Beam Indicator Light (LED) Inspection
Connect the leads in the same circuit as Check 3-2. Connect the terminal [7] to the battery (+) terminal. Check that the high beam indicator light (LED) [A] goes on. If the indicator light does not go on, replace the meter unit. ...

CAN Communication Line
CAN Communication Line Resistance Inspection In this model, resistors for CAN communication line are built in the ECU [A] and meter unit. Refer to the Meter Unit Inspection in the Electrical System chapter for the resistor in the meter unit. Turn the ignition switch to OFF. Remove: EC ...