Kawasaki Ninja Service Manual: Coupling Bearing Installation

Kawasaki Ninja Service Manual / Final Drive / Sprocket, Coupling / Coupling Bearing Installation

Coupling Bearing Installation


Apply high-temperature grease to the grease seal lips.

Special Tool - Bearing Driver Set: 57001-1129

Coupling Bearing Removal
Remove: Coupling Grease Seal Circlip [A] Special Tool - Inside Circlip Pliers: 57001-143 Remove the bearing [A] by tapping from the wheel side. Special Tool - Bearing Driver Set ...

Coupling Bearing Inspection
Since the coupling bearing is made to extremely close tolerances, the clearance can not normally be measured. NOTE It is not necessary to remove the coupling bearing for inspection. If the bea ...

Other materials:

Front Wheel Rotation Sensor Wiring Inspection (Service Code b 43)
Disconnect the front wheel rotation sensor lead connector [A] (see Front Wheel Rotation Sensor Removal in the Brakes chapter). Disconnect the KIBS hydraulic unit lead connector (see KIBS Hydraulic Unit Removal in the Brakes chapter). Check the wiring continuity of the W lead and ...

Technical Information-Power Mode
The rider can choose from three engine power modes to suit their preferences and road conditions. The FI ECU controls the engine power by adjusting fuel injection, air intake, and ignition timing. It enables three-mode selection: Full Power (Mode F), Middle Power (Mode M), and Low Power (M ...

Coolant Reserve Tank Installation
Install the following to the coolant reserve tank [A]. Pad [B] Gasket [C] Cap [D] Collar [E] Install the coolant reserve tank and tighten the bolt [F]. Run the hoses correctly (see Cable,Wire, and Hose Routing section in the Appendix chapter). Fill the coolant reserve tank with ...