Kawasaki Ninja Service Manual: Nozzle Assy Removal

Kawasaki Ninja Service Manual / Fuel System (DFI) / Nozzle Assy / Nozzle Assy Removal

Nozzle Assy Removal


Nozzle Assy
...

Nozzle Assy Installation
Replace the dust seals [A] with new ones. Apply engine oil to the new dust seals, and install them. Install the nozzle assy securely. Push the four mounting positions of the injectors. Set ...

Other materials:

Rebound Damping Force Adjustment
To adjust the rebound damping force, turn the rebound damping adjuster [A] to the desired position. The standard adjuster setting is the 1 3/4 turns out from the fully clockwise position. Rebound Damping Force Adjustment ...

Shift Pedal Removal
Remove: Shift Lever Bolt [A] Front Footpeg Bracket Bolts [B] If the tie-rod [C] is to be removed from the shift pedal and the shift lever, loosen the tie-rod locknuts [D]. The front tie-rod locknut is left-hand thread. Remove: Shift Pedal Mounting Bolt [A] ...

Timing Rotor Installation
Install the timing rotor [A] on the crankshaft [B] with their teeth [C] aligned. Holding the timing rotor with the flywheel & pulley holder and tighten the bolt. Torque - Timing Rotor Bolt: 39 N·m (4.0 kgf·m, 29 ft·lb) Special Tool - Flywheel & Pulley Holder: 57001-1605 I ...