Radiator Fan Relay Inspection
Subthrottle Valve Actuator RemovalConnecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
Fuel Injector Audible Inspection
NOTE
Be sure the battery is fully charged.
The secondary fuel injectors are operating with following
conditions.
1. The engine speed is more than 6 000 r/min (rpm).
2. The throttle opening is more than 12В°.
Remove:
Fuel Tank (see Fuel Tank Removal)
Primary Fuel Hose (see Fuel ...
Stick Coil Removal
Remove the air cleaner housing (see Air Cleaner Housing
Removal in the Fuel System (DFI) chapter).
Disconnect the stick coil connectors [A].
Pull out the stick coils [B] upward.
First, turn the stick coil by 90 degrees, and then pull it out
by twisting the coil head to the left and righ ...