Kawasaki Ninja Service Manual: Upper Inner Fairing Installation

Kawasaki Ninja Service Manual / Frame / Fairings / Upper Inner Fairing Installation

Place the tab [A] under the cover as shown in the figure.

Insert the projection [B] into the grommet [C].

Upper Inner Fairing Installation


Upper Inner Fairing Removal
Remove: Quick Rivet [A] Bolt [B] Clear the projection [C] from the hole and remove the upper inner fairing. ...

Center Inner Fairing Removal
Remove: Quick Rivets [A] (Both Sides) Screw [B] Bring the center inner fairing [C] backward to clear the front edge while lift up the upper fairing edges lightly. ...

Other materials:

Information for Coolant
To protect the cooling system (consisting of the aluminum engine and radiator) from rust and corrosion, the use of corrosion and rust inhibitor chemicals in the coolant is essential. If coolant containing corrosion and rust inhibitor chemicals are not used, over a period of time, the cooling ...

Air Switching Valve Installation
Install the air switching valve [A] with hose [B] as shown in the figure. Front [C] Left Side View [D] White Paint [E] Air Switching Valve Operation Test Refer to the Air Suction System Damage Inspection in the Periodic Maintenance chapter. Air Switching Valve Unit Test ...

External Shift Mechanism Installation
Install the gear positioning lever [A] as shown in the figure. Install: Spring [B] Washer [C] Tighten: Torque - Gear Positioning Lever Bolt [D]: 12 N·m (1.2 kgf·m, 106 in·lb) Assemble: Ratchet [A] Pawls [B] Pins [C] Springs [D] Install the shift ratchet ...