Kawasaki Ninja Service Manual: Upper Inner Fairing Installation

Kawasaki Ninja Service Manual / Frame / Fairings / Upper Inner Fairing Installation

Place the tab [A] under the cover as shown in the figure.

Insert the projection [B] into the grommet [C].

Upper Inner Fairing Installation


Upper Inner Fairing Removal
Remove: Quick Rivet [A] Bolt [B] Clear the projection [C] from the hole and remove the upper inner fairing. ...

Center Inner Fairing Removal
Remove: Quick Rivets [A] (Both Sides) Screw [B] Bring the center inner fairing [C] backward to clear the front edge while lift up the upper fairing edges lightly. ...

Other materials:

ESD Actuator Input Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Disconnect the ESD actuator connector and connect a suitable measuring leads [A] between these connectors as shown. Main Harness [B] ESD Actuator [C] Connect the peak voltage adapter [D] and a digital ...

Before Servicing
Before starting to perform an inspection service or carry out a disassembly and reassembly operation on a motorcycle, read the precautions given below. To facilitate actual operations, notes, illustrations, photographs, cautions, and detailed descriptions have been included in each chapter w ...

Master Cylinder Inspection (Visual Inspection)
Remove the master cylinders (see Front/Rear Master Cylinder Removal). Disassemble the front and rear master cylinders (see Master Cylinder Rubber Parts Replacement in the Periodic Maintenance chapter). Check that there are no scratches, rust or pitting on the inner wall [A] of each ma ...