Kawasaki Ninja Service Manual: Upper Inner Fairing Installation

Kawasaki Ninja Service Manual / Frame / Fairings / Upper Inner Fairing Installation

Place the tab [A] under the cover as shown in the figure.

Insert the projection [B] into the grommet [C].

Upper Inner Fairing Installation


Upper Inner Fairing Removal
Remove: Quick Rivet [A] Bolt [B] Clear the projection [C] from the hole and remove the upper inner fairing. ...

Center Inner Fairing Removal
Remove: Quick Rivets [A] (Both Sides) Screw [B] Bring the center inner fairing [C] backward to clear the front edge while lift up the upper fairing edges lightly. ...

Other materials:

Exhaust Pipe Removal
Remove: Radiator (see Radiator and Radiator Fan Removal in the Cooling System chapter) Exhaust Pipe Clamp Bolt [A] (Loosen) Remove the exhaust pipe holder nuts [A], and pull out the exhaust pipe [B] forward from the premuffler chamber. ...

Shift Pedal Removal
Remove: Shift Lever Bolt [A] Front Footpeg Bracket Bolts [B] If the tie-rod [C] is to be removed from the shift pedal and the shift lever, loosen the tie-rod locknuts [D]. The front tie-rod locknut is left-hand thread. Remove: Shift Pedal Mounting Bolt [A] ...

Cylinder Head Removal
Remove: Thermostat Housing (see Thermostat Removal in the Cooling System chapter) Exhaust Pipe (see Exhaust Pipe Removal) Camshafts (see Camshaft Removal) Heat Insulation Plate [A] (see Engine Removal in the Engine Removal/Installation chapter) Place a container under the coolant dr ...