Kawasaki Ninja Service Manual: Upper Inner Fairing Installation

Kawasaki Ninja Service Manual / Frame / Fairings / Upper Inner Fairing Installation

Place the tab [A] under the cover as shown in the figure.

Insert the projection [B] into the grommet [C].

Upper Inner Fairing Installation


Upper Inner Fairing Removal
Remove: Quick Rivet [A] Bolt [B] Clear the projection [C] from the hole and remove the upper inner fairing. ...

Center Inner Fairing Removal
Remove: Quick Rivets [A] (Both Sides) Screw [B] Bring the center inner fairing [C] backward to clear the front edge while lift up the upper fairing edges lightly. ...

Other materials:

Throttle Grip and Cables
Free Play Inspection Refer to the Throttle Control System Inspection in the Periodic Maintenance chapter. Free Play Adjustment Refer to the Throttle Control System Inspection in the Periodic Maintenance chapter. Cable Installation Install the throttle cables in accordance with the Cable, ...

Amplifier Input Voltage Inspection
NOTE Be sure the battery is fully charged. Turn the ignition switch to OFF. Remove the upper fairing (see Upper Fairing Removal in the Frame chapter). Do not disconnect the connectors. Connect a digital meter to the amplifier connector [A] with needle adapter set. Special To ...

Air Suction System Damage Inspection
Separate the air switching valve hose [A] from the lower air cleaner housing [B] (see Air Cleaner Housing Removal in the Fuel System (DFI) chapter). Connect the following parts temporarily. Fuel Pump Lead Connector [A] Extension Tube [B] Air Cleaner Housing (see Air Cleaner Hou ...