Kawasaki Ninja Service Manual: Upper Inner Fairing Installation

Kawasaki Ninja Service Manual / Frame / Fairings / Upper Inner Fairing Installation

Place the tab [A] under the cover as shown in the figure.

Insert the projection [B] into the grommet [C].

Upper Inner Fairing Installation


Upper Inner Fairing Removal
Remove: Quick Rivet [A] Bolt [B] Clear the projection [C] from the hole and remove the upper inner fairing. ...

Center Inner Fairing Removal
Remove: Quick Rivets [A] (Both Sides) Screw [B] Bring the center inner fairing [C] backward to clear the front edge while lift up the upper fairing edges lightly. ...

Other materials:

Before Servicing
Before starting to perform an inspection service or carry out a disassembly and reassembly operation on a motorcycle, read the precautions given below. To facilitate actual operations, notes, illustrations, photographs, cautions, and detailed descriptions have been included in each chapter w ...

Hub Bearing Inspection
Since the hub bearings are made to extremely close tolerances, the clearance can not normally be measured. NOTE Do not remove any bearings for inspection. If any bearings are removed, they will need to be replaced with new ones. Turn each bearing in the hub back and forth [A] while checki ...

Subthrottle Valve Actuator Resistance Inspection
Turn the ignition switch to OFF. Disconnect the subthrottle valve actuator connector [A]. Connect a digital meter to the subthrottle valve actuator connector [A]. Measure the subthrottle valve actuator resistance. Subthrottle Valve Actuator Resistance Connections: Y/BK lead [1 ...