Kawasaki Ninja Service Manual: Upper Inner Fairing Installation

Kawasaki Ninja Service Manual / Frame / Fairings / Upper Inner Fairing Installation

Place the tab [A] under the cover as shown in the figure.

Insert the projection [B] into the grommet [C].

Upper Inner Fairing Installation


Upper Inner Fairing Removal
Remove: Quick Rivet [A] Bolt [B] Clear the projection [C] from the hole and remove the upper inner fairing. ...

Center Inner Fairing Removal
Remove: Quick Rivets [A] (Both Sides) Screw [B] Bring the center inner fairing [C] backward to clear the front edge while lift up the upper fairing edges lightly. ...

Other materials:

Meter instruments
Upper Button Lower Button Tachometer (with Shift-Up Indicator) Red Zone Ambient Brightness Sensor Turn Signal Indicator Light Warning Indicator Light (Red) Neutral Indicator Light Multifunction Meter High Beam Indicator Light Warning Indicator Light (Yellow) Fuel ...

Brake Disc Warp Inspection
Raise the wheel off the ground with the jack. Special Tools - Jack: 57001-1238 Jack Attachment: 57001-1608 For front disc inspection, turn the handlebar fully to one side. Set up a dial gauge against the disc [A] as shown in the figure and measure disc runout, while turning [B] the ...

Main Throttle Sensor Output Voltage Inspection
Measure the output voltage at the main throttle sensor in the same way as input voltage inspection, note the following. Disconnect the main throttle sensor connector and connect the setting adapter [A] between these connectors. Special Tool - Throttle Sensor Setting Adapter: 57001 -15 ...