Kawasaki Ninja Service Manual: Upper Inner Fairing Installation

Kawasaki Ninja Service Manual / Frame / Fairings / Upper Inner Fairing Installation

Place the tab [A] under the cover as shown in the figure.

Insert the projection [B] into the grommet [C].

Upper Inner Fairing Installation


Upper Inner Fairing Removal
Remove: Quick Rivet [A] Bolt [B] Clear the projection [C] from the hole and remove the upper inner fairing. ...

Center Inner Fairing Removal
Remove: Quick Rivets [A] (Both Sides) Screw [B] Bring the center inner fairing [C] backward to clear the front edge while lift up the upper fairing edges lightly. ...

Other materials:

Fuel Injector Fuel Line Inspection
Remove: Fuel Tank (see Fuel Tank Removal) Air Cleaner Housing (see Air Cleaner Housing Removal) Disconnect: Primary and Secondary Fuel Hoses (see Fuel Hose Replacement in the Periodic Maintenance chapter) Do not remove the nozzle assy from the air cleaner housing. Be sure to pla ...

Water Temperature Sensor Inspection
Remove the water temperature sensor (see Water Temperature Sensor Removal/Installation in the Fuel System (DFI) chapter). Suspend the sensor [A] in a container of coolant so that the temperature-sensing projection [C] is submerged. Suspend an accurate thermometer [B] with temperature ...

Clutch
Clutch Operation Inspection Pull the clutch lever just enough to take up the free play [A]. Measure the gap between the lever and the lever holder. If the gap is too wide, the clutch may not release fully. If the gap is too narrow, the clutch may not engage fully. In either case, adjust ...