Kawasaki Ninja Service Manual: Upper Inner Fairing Installation

Kawasaki Ninja Service Manual / Frame / Fairings / Upper Inner Fairing Installation

Place the tab [A] under the cover as shown in the figure.

Insert the projection [B] into the grommet [C].

Upper Inner Fairing Installation


Upper Inner Fairing Removal
Remove: Quick Rivet [A] Bolt [B] Clear the projection [C] from the hole and remove the upper inner fairing. ...

Center Inner Fairing Removal
Remove: Quick Rivets [A] (Both Sides) Screw [B] Bring the center inner fairing [C] backward to clear the front edge while lift up the upper fairing edges lightly. ...

Other materials:

Cylinder Head Cover Removal
Remove: Air Suction Valves (see Air Suction Valve Removal) Throttle Body Assy (see Throttle Body Assy Removal in the Fuel System (DFI) chapter) Stick Coils (see Stick Coil Removal in the Electrical System chapter) Remove the clamps [A]. Turn up the front side of the heat insulation ...

Rear Frame Front Removal
Remove: Rear Frame Rear (see Rear Frame Rear Removal) Rear Fender Front (see Rear Fender Front Removal) Rear Footpeg Bracket Bolts [A] Rear Footpeg Bracket [B] Rear Frame Front Bolts [C] Left Rear Frame Front [D] Remove: Rear Footpeg Bracket Bolts [A] Rear Footpeg Bracke ...

Cable, Wire, and Hose Routing
1. Clamp (Hold the regulator/rectifier lead. Run the lead inside of the installation hole.) 2. Clamp (Bend down the clamp, and hold the main harness and the vacuum hose (equipped models).) 3. Clamp (Hold the air intake solenoid valve lead (equipped models).) 4. Run the vacuum hose under ...