Main Throttle Sensor Output Voltage Inspection
Intake Air Pressure Sensor #1 RemovalCanister Inspection
Refer to the Evaporative Emission Control System Inspection
(CAL and SEA-B1 Models) in the Periodic Maintenance
chapter.
1. Green Hoses (Purge)
2. Fittings
3. Canister
4. White Hose (Vacuum)
5. Throttle Body Assy
6. Fuel Tank
7.Red Hose (Return)
8. Blue Hose (Breather)
9. Brack ...
Tightening Sequence
Generally, when installing a part with several bolts, nuts,
or screws, start them all in their holes and tighten them to
a snug fit. Then tighten them according to the specified sequence
to prevent case warpage or deformation which can
lead to malfunction. Conversely when loosening the bolts,
n ...
Battery Installation
Visually inspect the surface of the battery container.
If any signs of cracking or electrolyte leakage from the
sides of the battery.
Put the battery into the rear fender
Install the band [A].
Connect the positive (+) cable [B] (red cap) to the positive
(+) terminal first, and then ...