Technical Information - Electronic Steering Damper (ESD/ZX1000JD/KD models)
Periodic Maintenance ChartStarter Motor Assembly
Install the positive brush assy [A] and the starter motor
terminal [B] as shown in the figure.
Replace the O-ring [C] with a new one, and install it.
Install:
Brush Springs [A]
Negative Brush Assy [B]
Turn the stopper side [C] to inside.
Tighten:
Torque - Brush Holder S ...
Wiring Diagram (US, CA and CAL without KIBS Models)
ZX1000JC
ZX1000JD
...
Valve Clearance Inspection
NOTE
Valve clearance must be checked and adjusted when
the engine is cold (at room temperature).
Remove:
Crankshaft Sensor Cover (see Crankshaft Sensor Removal
in the Electrical System chapter)
Cylinder Head Cover (see Cylinder Head Cover Removal
in the Engine Top End chapter)
Turn t ...