Technical Information - Electronic Steering Damper (ESD/ZX1000JD/KD models)
Periodic Maintenance ChartConnecting Rod Big End Side Clearance Inspection
Measure connecting rod big end side clearance.
Insert a thickness gauge [A] between the big end and either
crank web to determine clearance.
Connecting Rod Big End Side Clearance
Standard: 0.13 0.38 mm
(0.0051 0.0150 in.)
Service Limit: 0.58 mm (0.023 in.)
If the clearance exceeds ...
System Components
1. KIBS ECU
With input from the front and rear wheel sensors and front
caliper hydraulic pressure, the KIBS ECU analyzes various
conditions on the motorcycle, and with additional information
from the FI ECU (engine speed, throttle position, gear
position, and clutch actuation) precisely control ...
Amplifier Input Voltage Inspection
NOTE
Be sure the battery is fully charged.
Turn the ignition switch to OFF.
Remove the upper fairing (see Upper Fairing Removal in
the Frame chapter).
Do not disconnect the connectors.
Connect a digital meter to the amplifier connector [A] with
needle adapter set.
Special To ...