
Fuel Pump Operating Voltage Inspection
Fuel Filter CleaningMud Guard Installation
Installation is the reverse of removal. Note the following.
Run the hose and lead correctly (see Cable, Wire, and
Hose Routing section in the Appendix chapter).
Check the brake line.
Apply a non-permanent locking agent to the threads of
the mud guard mounting bolts [A, B], and tighten them ...
Radiator Fan Relay Inspection
Refer to the Relay Circuit Inspection in the Electrical System
chapter
If the radiator fan relay is normal, check the wiring for
continuity, using the wiring diagram in this section.
Special Tool - Hand Tester: 57001-1394
If the wiring is good, check the ECU for its ground and
power supp ...
Air Intake Solenoid Valve Unit Test
Remove the air intake solenoid valve (see Air Intake Solenoid
Valve Removal in the Fuel System (DFI) chapter).
Set the hand tester [A] to the × 1 Ω range and connect it
to the air intake solenoid valve terminals as shown in the
figure.
Special Tool - Hand Tester: 57001-1394
...